Question no : 802 PM Preventive Multiple Counter Plan Characteristics

PLM310 Preventive Maintenance
Unit 06 Maintenance Planning with Cycles of Different Dimensions

Which of the following is true about Multiple counter Plans ?
(more than one answers)

(A) A maximum of one time-based cycle can be used in a multiple counter plan.
(B) Once the cycle set has been included in the maintenance plan, the individual cycles can be changed or deleted.
(C) After the maintenance plan has been created, there is no longer a link between the cycle set and the maintenance plan.
(D) The task list included in the multiple counter plan cannot have reference to a strategy similar to what a time-base strategy method.
(E) You can assign cycles freely to the multiple counter plan. A strategy cannot be used here.
.