It is also called an "Assembly" Order based Strategy.
The fundamental principle is no Planned Independent Requirements (PIR) are allowed as Requirement is directly driven from the Sales Order. (you can see this configured in the Strategy in the slides)
As PIR is not allowed, it does mean the there is generally no planning possible from the finished goods level or planning of materials are done at the assembly level instead.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.