Unit 09 Maintenance Plan-Based Test Equipment
For calibration results to be recorded, you would have to :
(only one answer)
(A) assign inspection task list to the maintenance plan.
(B) create inspection task list.
(C) assign master inspection characteristics to the operations in the maintenance task list.
(D) create task list with operation control key “PM10” for inspection operations.
(E) assign inspection task list to the maintenance task list header.
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.