Thursday, July 10, 2025
Saturday, June 15, 2024
Question no 4004 : Calibration Plan characteristics
In SAP Plant Maintenance as at ECC6 EhP8, the Calibration scenario characteristics are which of the following ?
(more than one answers)
A. Use Inspection Plan assigned to Equipment Master.
B. A Maintenance Task List with Inspection Characteristics is expected.
C. The Call object from the Calibration Plan is an Inspection Lot.
D. When the Maintenance Order is called and later Released then the Inspection Lot will be created.
E. The Equipment concerned for Calibration must be linked to a Material-Serial.
.
Answer: B, D
A) Inspection Plans cannot be assigned to Equipment Masters or Functional Location in ECC6.
(more than one answers)
A. Use Inspection Plan assigned to Equipment Master.
B. A Maintenance Task List with Inspection Characteristics is expected.
C. The Call object from the Calibration Plan is an Inspection Lot.
D. When the Maintenance Order is called and later Released then the Inspection Lot will be created.
E. The Equipment concerned for Calibration must be linked to a Material-Serial.
.
Answer: B, D
A) Inspection Plans cannot be assigned to Equipment Masters or Functional Location in ECC6.
B) Maintenance Task list with Inspection Characteristics are expected and this can be FL Task List, EQ Task List or General Task List.
C, D) The call object for a Calibration is the Maintenance Order where later when the Order is Released, then it will create the Inspection Lot Automatically.
E) Calibration done internally do not required the Equipment link to Material-Serial (not necessary), just the Equipment or Functional Location is acceptable.
C, D) The call object for a Calibration is the Maintenance Order where later when the Order is Released, then it will create the Inspection Lot Automatically.
E) Calibration done internally do not required the Equipment link to Material-Serial (not necessary), just the Equipment or Functional Location is acceptable.
Wednesday, March 29, 2023
Question 3964 : Maintenance Strategy
In SAP Plant Maintenance, which of the following Preventive Maintenance scenario requires a Maintenance Strategy ?
(more than one answers)
A) Single-Cycle Time-Based Maintenance Plan.
B) Single-Cycle Counter/Performance-Based Maintenance Plan.
C) Strategy-Plan Multiple-Time-Based Maintenance Plan.
D) Strategy-Plan Multiple-Counter/Performance-Based Maintenance Plan.
E) Multi-Counter Plan.
.
Answer: C, D
A Maintenance Strategy contains only one Unit of Measure of either Time (like Month, Year etc) or Others UOM (like KM, L, Hours etc) with different Cycles for the same UOM. The Maintenance Strategy is then assigned to the Task List Header for depicting the cycle for the Maintenance Operations. The Maintenance Strategy is then used to create Strategy Plan for either Time-based or Performance-based.
(more than one answers)
A) Single-Cycle Time-Based Maintenance Plan.
B) Single-Cycle Counter/Performance-Based Maintenance Plan.
C) Strategy-Plan Multiple-Time-Based Maintenance Plan.
D) Strategy-Plan Multiple-Counter/Performance-Based Maintenance Plan.
E) Multi-Counter Plan.
.
Answer: C, D
A Maintenance Strategy contains only one Unit of Measure of either Time (like Month, Year etc) or Others UOM (like KM, L, Hours etc) with different Cycles for the same UOM. The Maintenance Strategy is then assigned to the Task List Header for depicting the cycle for the Maintenance Operations. The Maintenance Strategy is then used to create Strategy Plan for either Time-based or Performance-based.
Tuesday, September 14, 2021
Question no 3878 : Call Objects in Maintenance Plan
In SAP PM as at ECC6.0 EhP6, which of the following are Call Objects possible in PM Maintenance Plan ?
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Service Entry Sheet.
D) Confirmation Slip.
E) Inspection Lot.
.
Answers: A, B, C
E) Inspection Lot as a Call Object is for QM Stability Study scenario.
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Service Entry Sheet.
D) Confirmation Slip.
E) Inspection Lot.
.
Answers: A, B, C
E) Inspection Lot as a Call Object is for QM Stability Study scenario.
In Plant Maintenance Preventive Scenario, the call object can be the following
Call object - Maintenance NotificationCall object -Maintenance OrderCall object -Service Entry SheetCall object -Maintenance Order (from MO generated Inspection Lot) for Calibration
Monday, September 13, 2021
Question no 3877 : Call Horizon in Maintenance Plan
In SAP PM as at ECC6.0 EhP6, how can the Call Horizon be entered in the Maintenance Plan Header ?
(more than one answers)
A) % and days withing the same Maintenance Plan.
B) days only in a Maintenance Plan.
C) % only in a Maintenance Plan.
D) All of the above.
E) None of the above.
.
Answer: B, C
In one of the enhancement package in ECC6, Call Horizon can either be in % or days in an MP but not both.
(more than one answers)
A) % and days withing the same Maintenance Plan.
B) days only in a Maintenance Plan.
C) % only in a Maintenance Plan.
D) All of the above.
E) None of the above.
.
Answer: B, C
In one of the enhancement package in ECC6, Call Horizon can either be in % or days in an MP but not both.
Tuesday, September 7, 2021
Question no 3876 : Factory Calendar in Plant Maintenance
In SAP PM as at ECC6.0 EhP6, which of the following the Factory Calendar can be assigned to ?
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Equipment Master.
D) Maintenance Work Center.
E) Maintenance Plan Header.
.
Answers: B, D, E
B) One of the Enhancement Package in ECC6 allows the Factor Calendar assignment to an MO so that scheduling can be based on a selected Factory Calendar for that MO (IW31/IW32/IW33).
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Equipment Master.
D) Maintenance Work Center.
E) Maintenance Plan Header.
.
Answers: B, D, E
B) One of the Enhancement Package in ECC6 allows the Factor Calendar assignment to an MO so that scheduling can be based on a selected Factory Calendar for that MO (IW31/IW32/IW33).
D) In the Capacity TAB of the Maintenance Work Center (IR01/IR02/IR03).
Tuesday, May 4, 2021
Question no 3835 : Single Maintenance Item
In SAP PM as at ECC6.0 EhP6, which of the following Maintenance Plan scenario only have one Maintenance Item allowed ?
(more than one answers)
A) When the Call Object is Service Order for Service Contract via IP50.
B) When the Call Object is Service Entry Sheet for Service Procurement via IP40.
C) When the Call Object is Maintenance Order for Multiple-Counter Plan via IP43.
D) When the Call Object is Maintenance Notification for Strategy Plan via IP42.
E) When the Call Object is Maintenance Order for Single-Cycle Plan via IP41.
.
Answers: A, B
B, E) SES as Call Object via IP50 and IP41 will have a single Maintenance Item.
A) IP50 for Service Contract for CS have one Maintenance Item.
(more than one answers)
A) When the Call Object is Service Order for Service Contract via IP50.
B) When the Call Object is Service Entry Sheet for Service Procurement via IP40.
C) When the Call Object is Maintenance Order for Multiple-Counter Plan via IP43.
D) When the Call Object is Maintenance Notification for Strategy Plan via IP42.
E) When the Call Object is Maintenance Order for Single-Cycle Plan via IP41.
.
Answers: A, B
B, E) SES as Call Object via IP50 and IP41 will have a single Maintenance Item.
A) IP50 for Service Contract for CS have one Maintenance Item.
Monday, May 3, 2021
Question no 3834 : Call Object Service Entry Sheet
In SAP PM as at ECC6.0 EhP6, which of the following are not possible in the Maintenance Item when the Call Object is a Service Entry Sheet ?
(more than one answers)
A) Technical Object.
B) Planning Plant and Planner Group.
C) Object List.
D) Priority.
E) Maintenance Activity Type.
.
Answers: A, B, C, D, E
When the Call Object is SES, the following is available in the Maintenance Item:
. Framework Purchase Order.
. Settlement Maintenance Order.
. General Ledger.
. Service Master.
(more than one answers)
A) Technical Object.
B) Planning Plant and Planner Group.
C) Object List.
D) Priority.
E) Maintenance Activity Type.
.
Answers: A, B, C, D, E
When the Call Object is SES, the following is available in the Maintenance Item:
. Framework Purchase Order.
. Settlement Maintenance Order.
. General Ledger.
. Service Master.
Wednesday, April 28, 2021
Question no 3833 : Maintenance Item Characteristics
In SAP PM as at ECC6.0 EhP6, which of the following are the TRUE characteristics in a Mintenance Item ?
(More than one answers)
A) The General Task List entry in the Maintenance Item is only available for entry when the Call Object is Maintenance Notification and Maintenance Order.
B) The General Task List entry in the Maintenance Item is not available for entry when the Call Object is a Service Entry Sheet.
C) The Planning Plant, Planner Group, and Maintenance Work Center are available for entry when the Call Object is Maintenance Notification and Maintenance Order.
D) The Planning Plant, Planner Group, and Maintenance Work Center are not available for entry when the Call Object is a Service Entry Sheet.
E) Catalog Codes cannot be entered in the Maintenance Item when the Call Object is a Maintenance Notification.
.
Answers: A, B, C, D, E
E) Task Codes can be generated via the Priority (from the configuration settings) in the Maintenance Item but not directly enterable in the Maintenance Item.
(More than one answers)
A) The General Task List entry in the Maintenance Item is only available for entry when the Call Object is Maintenance Notification and Maintenance Order.
B) The General Task List entry in the Maintenance Item is not available for entry when the Call Object is a Service Entry Sheet.
C) The Planning Plant, Planner Group, and Maintenance Work Center are available for entry when the Call Object is Maintenance Notification and Maintenance Order.
D) The Planning Plant, Planner Group, and Maintenance Work Center are not available for entry when the Call Object is a Service Entry Sheet.
E) Catalog Codes cannot be entered in the Maintenance Item when the Call Object is a Maintenance Notification.
.
Answers: A, B, C, D, E
E) Task Codes can be generated via the Priority (from the configuration settings) in the Maintenance Item but not directly enterable in the Maintenance Item.
Tuesday, April 27, 2021
Question no 3832 : Preventive Maintenance Call Object Notification
In SAP PM as at ECC6.0 EhP6, which of the following are characteristics of a Maintenance Item where the Call Object is a Notification ?
(more than one answers)
A) Planning Plant and Planner Group is defaulted from the Technical Object.
B) Maintenance Work Center is defaulted from the Technical Object.
C) Maintenance Activity Type is defaulted from the Technical Object.
D) Priority is defaulted from the Notification Type configuration.
E) General Task List is mandatory.
.
Answers: A, B,
A, B) The Technical Object defaults the Planning Plant, Planner Group, and Maintenance Work Center.
C) No Activity Type field in the Maintenance Item when call object is Notification.
D) Priority is manually entered.
E) General Task List is Optional.
.
(more than one answers)
A) Planning Plant and Planner Group is defaulted from the Technical Object.
B) Maintenance Work Center is defaulted from the Technical Object.
C) Maintenance Activity Type is defaulted from the Technical Object.
D) Priority is defaulted from the Notification Type configuration.
E) General Task List is mandatory.
.
Answers: A, B,
A, B) The Technical Object defaults the Planning Plant, Planner Group, and Maintenance Work Center.
C) No Activity Type field in the Maintenance Item when call object is Notification.
D) Priority is manually entered.
E) General Task List is Optional.
.
Monday, September 28, 2020
Question no 3740 : Single Cycle Plan
In SAP PM as at ECC6.0 EhP6, which of the following are the Usage of Single Cycle Plan ?
(more than one answers)
A) Single Cycle Counter-Based cycle Plan.
B) Single Cycle Time-Based cycle Plan.
C) Maintenance Plan for Calibration.
D) Maintenance Plan for Service Procurement to call Service Entry Sheet.
E) Call object can be both Maintenance Notification and Maintenance Order.
.
Answers: A, B, C, D, E
A) eg: every 5000km as a cycle for Single-Cycle Counter Plan.
B) eg: every 3 months as a cycle for Single-Cycle Time-Based Plan.
C) Calibration scenarios can use Single-Cycle Plan.
D) Service Procurement via IP40 a Single-Cycle Plan.
(more than one answers)
A) Single Cycle Counter-Based cycle Plan.
B) Single Cycle Time-Based cycle Plan.
C) Maintenance Plan for Calibration.
D) Maintenance Plan for Service Procurement to call Service Entry Sheet.
E) Call object can be both Maintenance Notification and Maintenance Order.
.
Answers: A, B, C, D, E
A) eg: every 5000km as a cycle for Single-Cycle Counter Plan.
B) eg: every 3 months as a cycle for Single-Cycle Time-Based Plan.
C) Calibration scenarios can use Single-Cycle Plan.
D) Service Procurement via IP40 a Single-Cycle Plan.
Wednesday, May 20, 2020
Question no 3695 : Multi-Counter Plan
In SAP PM as at ECC6.0 EhP6, which of the following are the characteristics of a Multi-Counter Plan ?
(more than one answers)
A) Counters are necessary for performance based UOM Cycles.
B) Cycle Set for the Task List assigned to the Multi-Counter Plan must match the Cycle Set assigned to the header of the Multi-Counter Plan.
C) Cycle Set is created with different unit of measure cycles.
D) The Strategy is only for Equipment Masters and not Functional Locations.
E) A General Task List without any Strategy can be used for the Multi-Counter Plan.
.
click "1 comment" for suggested answer
(more than one answers)
A) Counters are necessary for performance based UOM Cycles.
B) Cycle Set for the Task List assigned to the Multi-Counter Plan must match the Cycle Set assigned to the header of the Multi-Counter Plan.
C) Cycle Set is created with different unit of measure cycles.
D) The Strategy is only for Equipment Masters and not Functional Locations.
E) A General Task List without any Strategy can be used for the Multi-Counter Plan.
.
click "1 comment" for suggested answer
Wednesday, April 22, 2020
Question no 3691 : Calibration Plan Pre-requisite
In SAP PM as at ECC6.0 EhP6, which of the following are the necessary setup for Calibration scenario for PM Equipment via PM-QM integration ?
(more than one answers)
A) The correct Inspection Type assigned to the Maintenance Order Type.
B) Maintenance Plan Category will Call Object "Inspection Lot".
C) General Task List with Strategy Plan is Mandatory for Calibration scenario.
D) General Task List with Inspection Point at the Header.
E) Equipment Master activated for Calibration Planning.
.
Click on the "1 comment" button to check the Suggested answers
(more than one answers)
A) The correct Inspection Type assigned to the Maintenance Order Type.
B) Maintenance Plan Category will Call Object "Inspection Lot".
C) General Task List with Strategy Plan is Mandatory for Calibration scenario.
D) General Task List with Inspection Point at the Header.
E) Equipment Master activated for Calibration Planning.
.
Click on the "1 comment" button to check the Suggested answers
Wednesday, August 21, 2019
Question no 3657 : Maintenance Plan for SES
In SAP PM as at ECC6.0 EhP6, which of the following are characteristics of the Service Procurement Maintenance Plan that calls an SES ?
(more than one answers)
A) Framework Purchase Order.
B) Service master.
C) Cost Center.
D) Settlement Maintenance Order.
E) General Ledger.
.
Answers: A, B, D, E
Except cost center.
(more than one answers)
A) Framework Purchase Order.
B) Service master.
C) Cost Center.
D) Settlement Maintenance Order.
E) General Ledger.
.
Answers: A, B, D, E
Except cost center.
Wednesday, August 14, 2019
Question no 3656 : Maintenance Item
In SAP PM as at ECC6.0 EhP6, which of the following can have only one Maintenance Item ?
(only one answer)
A) Single-Cycle Plan when the calling object is a Maintenance Notification.
B) Single-Cycle Plan when the calling object is a Maintenance Order.
C) Single-Cycle Plan when the calling object is a Inspection Lot.
D) Single-Cycle Plan when the calling object is a Service Entry Sheet.
E) Single-Cycle Plan when the calling object is a Purchase Order.
.
Answer: D
(only one answer)
A) Single-Cycle Plan when the calling object is a Maintenance Notification.
B) Single-Cycle Plan when the calling object is a Maintenance Order.
C) Single-Cycle Plan when the calling object is a Inspection Lot.
D) Single-Cycle Plan when the calling object is a Service Entry Sheet.
E) Single-Cycle Plan when the calling object is a Purchase Order.
.
Answer: D
Wednesday, August 7, 2019
Question no 3655 : Strategy Plan
In SAP PM as at ECC6.0 EhP6, which of the following are the characteristics of a Maintenance Plan ?
(more than one answers)
A) It can only have one unit of measure for the Strategy.
B) It can be either time or performance based.
C) The Maintenance Plan can have one or more Maintenance Items.
D) All Task List assigned to the maintenance Plan of a Strategy Plan must have the same Strategy.
E) Both EQ and FL are possible for Strategy Plans.
.
Answers: A, B, C, D, E
All of the above.
(more than one answers)
A) It can only have one unit of measure for the Strategy.
B) It can be either time or performance based.
C) The Maintenance Plan can have one or more Maintenance Items.
D) All Task List assigned to the maintenance Plan of a Strategy Plan must have the same Strategy.
E) Both EQ and FL are possible for Strategy Plans.
.
Answers: A, B, C, D, E
All of the above.
Wednesday, July 31, 2019
Question no 3654 : Strategy Plan
In SAP PM as at ECC6.0 EhP6, which of the following are characteristics of a Strategy Plan ?
(only one answer)
A) A Strategy must be assigned to the Equipment Master.
B) A Strategy must be assigned to the Functional Location.
C) A Strategy must be assigned to the General Task List.
D) A Strategy must be assigned to the Plant Parameter.
E) A Strategy must be assigned to the Maintenance Plan Category.
.
Answer: C
The Strategy for the General Task List must match the Maintenance Plan Header's Strategy.
(only one answer)
A) A Strategy must be assigned to the Equipment Master.
B) A Strategy must be assigned to the Functional Location.
C) A Strategy must be assigned to the General Task List.
D) A Strategy must be assigned to the Plant Parameter.
E) A Strategy must be assigned to the Maintenance Plan Category.
.
Answer: C
The Strategy for the General Task List must match the Maintenance Plan Header's Strategy.
Sunday, March 3, 2019
Question no 3628 : Maintenance Item data
In SAP PM as at ECC6.0 EhP6, which of the following is not assigned to the Maintenance Item ?
(more than one answers)
A) Scheduling Period.
B) Call Horizon.
C) Measuring Point.
D) Shift Tolerances.
E) Scheduling time reference.
.
Answer: A, B, C, D, E
All of the above are at the Maintenance Plan Header.
(more than one answers)
A) Scheduling Period.
B) Call Horizon.
C) Measuring Point.
D) Shift Tolerances.
E) Scheduling time reference.
.
Answer: A, B, C, D, E
All of the above are at the Maintenance Plan Header.
Tuesday, November 20, 2018
Question no 3600 : Defaulting Order Type in the Maintenance Item
In SAP PM as at ECC6.0 EhP6, which of the following are used to default the Order Type in the Maintenance Item ?
(only one answer)
A) Planning Plant.
B) Planning Plant + Planner Group.
C) Planner Group.
D) Planning Plant + Maint.Work Center.
E) Planning Plant + Planner Group + Maint.Work Center.
.
Answer: B
IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item
(only one answer)
A) Planning Plant.
B) Planning Plant + Planner Group.
C) Planner Group.
D) Planning Plant + Maint.Work Center.
E) Planning Plant + Planner Group + Maint.Work Center.
.
Answer: B
IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item
Saturday, November 17, 2018
Question no 3599 : Maintenance Plan Structure
In SAP PM as at ECC6.0 EhP6, take the correct statements regarding Maintenance Plan.
(more than one answers)
A) All Maintenance Plan can have one or more Maintenance Items.
B) All Maintenance Items must be assigned with a Task List.
C) All Maintenance Items must be at least one Reference Object.
D) All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E) All Maintenance Plan must have at least one Maintenance Item for scheduling.
.
Answer: D, E
A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.
(more than one answers)
A) All Maintenance Plan can have one or more Maintenance Items.
B) All Maintenance Items must be assigned with a Task List.
C) All Maintenance Items must be at least one Reference Object.
D) All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E) All Maintenance Plan must have at least one Maintenance Item for scheduling.
.
Answer: D, E
A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.