Question no 3605 : Hierarchy Task List Structure

In SAP PM as at ECC6.0 EhP7, the following are correct about Hierarchy Task List Structure EXCEPT one ?

(only one answer)

A)  You can create a General Hierarchy Task List, but not Equipment or Functional Location Hierarchy Task List.
B)  The Equipment Hierarchy Task List can be created and assigned to one or more Equipments.
C)  The Functional Location Hierarchy Task List can be created and assigned to one or more Functional Locations.
D)  The Number Range for EQ and FL Hierarchy Task List can have both internal and external Number Range.
E)   A Strategy cannot be assigned to a Hierarchy Task List.
.

Answer: E

A)  You can create General, EQ, or FL Hierarchy Task List (with A, E, T Task List Type indicator).
B, C) Both EQ and FL Hierarchy Task List (as at the version mentioned) can only be relevant or assigned to one EQ or one FL.
D)  The same number range concept applies to General, EQ, or FL Task List as to the Hierarchy Task List. Which means the EQ and FL and Hierarchy EQ and Hierarchy FL Task List can only have internal number range for the Group number.
E)  The Header of the Hierarchy Task List contain: Group number, Counter, Planning Plant, Usage, Status, Short Text, External Identification, Change Number, and Date. 

Friday, December 7, 2018

Question no 3604 : Hierarchy Task List Structure

In SAP PM as at ECC6.0 EhP6, which of the following about Hierarchy Task List are Correct ?

(more than one answers)

A)  Hierarchy Task List Number Range is different from the General Task List Number Range.
B)  Hierarchy Task List can be assigned to the Maintenance Notification.
C)  Hierarchy Task List can be assigned to the Maintenance Item.
D)  Hierarchy Task List has a header with Usage and Status.
E)  Planning Plant is not necessary for Hierarchy Task List.
.

Answer: B, C, D

A) Number Range is shared
E) Planning Plant is necessary for FL, EQ, General, and Hierarchy Task List.

Thursday, August 9, 2018

Question no 3578 : Object Dependency for Configurable Task List

In SAP PM as at ECC6.0 EhP6, which of the following Object Dependency type is assigned to the Operation of the Configurable Task List for Operation Selection ?

(only one answer)

A)  Selection Condition.
B)  Action.
C)  Procedure.
D)  Net.
E)  Pre-Condition.
.

Answer: A

Selection Condition is for selecting an object.
Action and Procedure are for making selection mandatory and set values.
Net is a more complex rule writing usually used for calculations.
Pre-Condition is like (if then else in programming)

Wednesday, August 8, 2018

Question no 3577 : Configurable Task List

In SAP PM as at ECC6.0 EhP7, a _______________ links a Variant Class to a General Task List to declare it as a Configurable Task List.

(only one answer)

A)   Configuration Profile.
B)   Object Dependency.
C)   KMAT Material.
D)   Object Link.
E)   Configurable Equipment.
.

Answer: A

CU41 Configuration Profile.

Thursday, July 19, 2018

Question no 3566 : Task List assignment

In SAP PM as at ECC6.0 EhP7, the following objects/scenarios can be assigned with a Task List EXCEPT one?

(only one answer)

A)   Maintenance Notification.
B)   Maintenance Order.
C)   Maintenance Item for Maintenance Plan with Call Object as Maintenance Notification.
D)   Maintenance Item for Maintenance Plan with Call Object as Maintenance Order.
E)   Maintenance Item for Maintenance Plan with Call Object as Service Entry Sheet.
.

Answer: E

SES not yet allow Task list for the said version

Thursday, July 12, 2018

Question no 3562 : Mass Replacement in Plant Maintenance

In SAP PM as at ECC6.0 EhP6, which of the following "Mass Replacement" functions are available for objects in the Task List ?

(more than one answers)

A)   Components assigned to the Task List Operation.
B)   Work Center assigned to the Task List Operation.
C)   PRT assigned to the Task List Operation.
D)   Assembly assigned to the Task List Header.
E)   Planning Plant assigned to the Task List Header.
.

Answer: B, C

CA87 Replace Work Center.
CA77 Replace PRT.

Wednesday, July 11, 2018

Question no 3561 : Plant Maintenance Control Key

In SAP PM as at ECC6.0 EhP6, which of the following functions are configurable via the "Control Key" assigned to the Operations ?

(more than one answers)

A)  Print control.
B)  Costing.
C)  Capacity.
D)  Scheduling.
E)  Milestone Confirmation.
.

Answer: A, B, C, D

Except Milestone Confirmation.

Monday, July 9, 2018

Question no 3560 : CBAU Material Type

In SAP PM as at ECC6.0 EhP6, which of the following applications in Plant Maintenance will use the Material Type called "CBAU" ?

(only one answer)

A)  Pool Asset Management.
B)  Compatible Units.
C)  Configurable Task List.
D)  Configuration Equipment.
E)  Work Clearance Management.
.

Answer: B

Is if for IS-Utilities Work Management CU (Compatible Units)

Sunday, July 8, 2018

Question no 3559 : Free Material Assignment

In SAP PM as at ECC6.0 EhP6, what is the purpose of "Free Material Assignment" ?


(only one answer)

A)  Allows the use of Material BOM with this BOM usage.
B)  Ensure the right Material BOM with this usage is assigned as Construction Type.
C)  Ensure the right Material BOM with this usage is assigned as Assembly.
D)  Define the BOM Usage valid for the PM application.
E)  Disallow manual entry of components without selecting from the BOM.
.

Answer: E

If Blank, you cannot freely enter a material in the Task List
If set to Usage "4", freely entered material in the Task List will be generated as a Standard BOM with this BOM Usage. 

Wednesday, June 13, 2018

Question no 3548 : Material Type for Material Master PRT

In SAP PM as at ECC6.0 EhP6, which of the following is the Standard SAP Delivered Material Type for creating a PRT Material Master ?

(only one answer)

A)   PRT.
B)   ERSA.
C)   FHMI.
D)   MPRT.
E)   PRTM.
.

Answer: C

Material Type "FHMI".

Tuesday, July 3, 2012

Question no 1605 : Profile for Default value for Maintenance Task List

In SAP PM ECC6.0, the characteristics of the Profile for Default value for Maintenance Task List are _________________ .

(more then one answers)

A) Default the Maintenance Work Center.
B) Default the Task List Usage and Task List Status.
C) Assign a Field Key.
D) Ensure a graphic profile is available for Network operations maintenance.
E) Default the Control Key.
.

Friday, May 25, 2012

Question no 1577 : Maintenance Task List in Maintenance Plan

In SAP PM, what are the options for use or selection of the maintenance task list in the Maintenance Plan ?

(more then one answers)

A)    You can create new Maintenance Task list in the Maintenance Plan while creating the Maintenance item.
B)    You can choose or select from existing Maintenance Task list in the Maintenance item.
C)    You can ignore and not include a Maintenance Task list in the Maintenance item of the Maintenance Plan.
D)    You can include one Maintenance Task list in the Maintenance plan header to be used for all Maintenance Items.
E)    You can include either a suitable Equipment Task list or Functional Location Task list or General Task list in the Maintenance item.
.

Thursday, March 31, 2011

Question no 1024 : Service Packages in Maintenance Task List

In SAP PM, which of the following can be assigned in a Service Package ?

(only one answer)

A)       Material Master.
B)       Service Master.
C)       PRT.
D)       Material Master with a material type for services.
E)       Maintenance Strategy.
.

Wednesday, March 30, 2011

Question no 1023 : Maintenance Task List concepts

In SAP PM, about Maintenance Task List, which of the following are not true ?

(more then one answers)

A)      Maintenance Packages are only available for General Task List, and not for Equipment of Functional Location Task List.
B)      Service Packages are available only for control key PM02 and PM03 for all types of Maintenance Task List.
C)      All Maintenance Task list types will have internal and external number ranges for the Group number.
D)      There are no number ranges assignment for the Group counters.
E)      A General Task List can be assigned to several Equipments.
.

Tuesday, March 29, 2011

Question no 1022 : Maintenance Task List Header

In SAP PM, which of the following is true about General Maintenance Task List ?

(more then one answers)

A)      It can have either internal or external number for the Group number.
B)      The group counter can be an alphanumeric entry.
C)      The group counter can be either alphanumeric or numeric entry.
D)      A valid usage and status is mandatory for Task List selection.
E)      Multiple materials can be assigned to the Task List header.
.

.

Monday, March 28, 2011

Question no 1021 : Maintenance Task list operations

In SAP PM, which of the following statement is not true about component assignment to a maintenance operations in a maintenance task list ?

(more then one operations)

A)      When manually entering a component to an operation, you can enter the item category "L" for Stock material or "N" for non-stock.
B)       The same component several times to one operation.
C)       A component entered in an operation cannot be repeated its assignment again in another operation.
D)       Only item category "L" is allowed for manual entry of component to an operation.
E)        A non-stock material can be selected from the structure list into the component screen of an operation.
.

Sunday, March 27, 2011

Question no 1020 : Component assignment in Task List

In SAP PM, which of the following techniques are available to add or assign components to an operation in the maintenance task list ?

(more then one answers)

A)     via Structure list.
B)      via Structure graphics.
C)      via Internet Catalog.
D)      via Manual entry.
E)       via Service Package.
.
.

Monday, March 14, 2011

Question no 1013 : Maintenance Task List

In SAP PM, which of the following are possible PRTs that can be assigned to a maintenance operation ?

(more then one answer)

A)      Material PRT.
B)      Document PRT.
C)      Equipment PRT.
D)      Miscellaneous PRT.
E)      Measuring Point.
.

Wednesday, December 1, 2010

Question no : 772 PM Preventive Configurable task list

PLM310 Preventive Maintenance
Unit 03 Maintenance Planning with Single Cycle

When assigning a configurable general maintenance task lists in the Single-Cycle maintenance plan:
(more than one answers)

(A) You can include a configurable general maintenance task lists in the maintenance plan regardless of the type of equipment entered in the maintenance item.
(B) You can include a configurable general maintenance task lists in the maintenance plan only if you assign a configurable piece of equipment as a reference object in the maintenance item.
(C) The configuration profiles of the general maintenance task list and equipment must refer to the same class.
(D) The configuration profiles of the general maintenance task list and equipment need not ref to the same class.
(E) The object dependencies to the items in the equipment BOM and the operations in the general maintenance task list must use the same characteristics.
.

Question no : 766 PM Mater Data Configurable Task List

PLM310 Preventive Maintenance
Unit 02 Management of Task Lists.

You can use object dependencies to select which of the following objects from the configurable task list ?
(more than one answers)

(A) Operations.
(B) Service packages.
(C) Maintenance packages.
(D) Documents.
(E) Production resource tools.
.