Wednesday, May 20, 2015

Question no 3036 : Safety Measure List Objects

In SAP PM/CS as at ECC6 EhP7, some of the following master data must exist so that you can include in the safety measure list, what are they ?

(more than one answers)

A)   Permit Masters.
B)   Technical Objects.
C)   Maintenance Task List.
D)   PRTs
E)   Document Info Records.
.

Tuesday, June 10, 2014

Question no 2392 : Production Resource Tool for Plant Maintenance

In SAP Plant Maintenance ECC6.0 EhP5, which of the following are valid PRTs (Production Resource Tools) which can be assigned to the General Task List Operations ?

(more then one answers)

A)    Document PRT.
B)    Material PRT.
C)    Equipment PRT.
D)    Miscellaneous PRT.
E)    Measuring Point PRT.
.

Tuesday, May 27, 2014

Question no 2382 : Notification Type

As at ECC6.0 EhP6 for Plant Maintenance (EAM), which of the following object in PM uses the Notification Type to define as its processing document ?

(more then one answers)

A)    Pool Asset Management Request.
B)    Shift Note Type.
C)    Shift Report Type.
D)    Takeover and Handover Request.
E)    Rotables Management.

Friday, May 23, 2014

Question no 2381 : Linear Data

In SAP EAM at EhP6 ECC6.0, the LAM data Linear Data Fields has been enhanced into which of the following PM data ?

(more then one answers)

A)    Maintenance Notifications.
B)    Work Order Header.
C)    Work Order Operations.
D)    Work Order Confirmations.
E)    Measurement Documents.
.

Question no 2380 : LAM

In SAP ECC6.0 EAM Linear Asset Management as at EhP5, the use of ____________ is understood as the distance or displacement of an object to the reference line of a linear technical asset.

(only one answer)

A)     Offset.
B)     Linear Reference Pattern (LRP).
C)     Location.
D)     Reference Point.
E)     Reference Location.
.

Sunday, May 11, 2014

Question no 2370 : Inspection Round in Plant Maintenance

In SAP ECC6.0 EhP4 Plant Maintenance, which of the following is TRUE about the new Inspection Round Scenario ?

(more then one answers)

A)  You can now assign Measuring Point as PRT in the General Task list Operations.
B)  You can now assign Measuring Point as PRT in the Maintenance Order Operations.
C)  You can now assign Measuring Point as PRT in the Maintenance Order Components.  
D)  You can now assign Measuring Point as PRT in the Bills of Material Components.
E)  You can now assign Measuring Point as PRT in the Maintenance Item Object List.
.

Thursday, May 8, 2014

Question no 2368 : Digital Signature in Plant Maintenance

In SAP PM ECC6.0 EhP2, Digital Signature applied to the Operations of an order will do the following ?

(more then one answers)

A)    A 'DSIG' system status is written to the Order operation.
B)    Components assigned to the operation cannot be changed unless the Digital Signature is Reset.
C)    Digital Signature cannot be Set or Reset once the Order has been Released.
D)    Quantities of Components assigned to the operation can be changed but the Component cannot be deleted when the Digital Signature is Set.
E)    You can use Digital Signature to Lock Components only but not Operations.
.  

Saturday, May 3, 2014

Question no 2364 : Maintenance Order Delta Print

In SAP PM ECC6.0 EhP5, in which of the following circumstance, the system sets the system status 'MPRT' (Modified After Print) to the operation ?

(more then one answers)

A)    Changing the Operation Description.
B)    Changing the Operation Work Time.
C)    Assigning a new Component to the Operation.
D)    Changing the quantity of an existing Component assigned to the Operation.
E)    Changing the Work Center already assigned to the Operation.
.

Sunday, April 27, 2014

Question no 2360 : Hierarchy Task List

In SAP PM ECC6.0, which of the following tools allows you to convert a Notification assigned with a Hierarchy Task list to more then one Maintenance Order with a Revision number ?

(only one answer)

A)    WPS1 Maintenance Event Builder.
B)    IW38 Change Order List.
C)    IW70 Scheduling of Overall Network.
D)    IW36 Create Special Sub-Order.
E)    LBK1 Logbook.

Sunday, August 25, 2013

Question no 2015 : Pool Asset Management

In SAP EAM ECC6.0 EnP3, which of the following statements are TRUE about Pool Asset Management ?

(more then one answers)

A)   The 'PAM Pool' is assigned to a Functional Location with Equipments.
B)   The 'PAM Pool' is assigned direclty to a list of Equipments.
C)   In the Graphical Planning Board, the use of 'Demand' ICON results in a Notification.
D)   During Settlement of Notification 'MF', the cost are debited to the Notification.
E)   Counter Reading are entered both at the 'Issue Vehicle' & 'Return Vehicle' steps.
.