Question no 3600 : Defaulting Order Type in the Maintenance Item

In SAP PM as at ECC6.0 EhP6, which of the following are used to default the Order Type in the Maintenance Item ?

(only one answer)

A)   Planning Plant.
B)   Planning Plant + Planner Group.
C)   Planner Group.
D)   Planning Plant + Maint.Work Center.
E)   Planning Plant + Planner Group + Maint.Work Center.
.

Answer: B

IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item

Saturday, November 17, 2018

Question no 3599 : Maintenance Plan Structure

In SAP PM as at ECC6.0 EhP6, take the correct statements regarding Maintenance Plan.

(more than one answers)

A)  All Maintenance Plan can have one or more Maintenance Items.
B)  All Maintenance Items must be assigned with a Task List.
C)  All Maintenance Items must be at least one Reference Object.
D)  All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E)  All Maintenance Plan must have at least one Maintenance Item for scheduling.
.

Answer: D, E

A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.

Monday, November 12, 2018

Question no 3598 : Call Object by Maintenance Plan Category

In SAP PM as at ECC6.0 EhP6, which of the following are possible Call Objects via Maintenance Plan Category ?

(more than one answers)

A)  Maintenance/Service Notification.
B)  Maintenance/Service Order.
C)  Service Entry Sheet.
D)  Inspection Notification.
E)  Inspection Lot.
.

Answer: A, B, C, E

Calling Inspection Lot is a function of QM. (but it is still possible via the same MP Category configuration)

Tuesday, June 26, 2018

Question no 3551 : Single Cycle Plan Characteristics

In SAP PM as at ECC6.0 EhP6, which of the following are Characteristics of  a Single Cycle Maintenance Plan ?

(more than one answers)

A)  Each Plan can have only one time-based cycle.
B)  Each Plan can have only one counter.
C)  Each Plan can have one or more Maintenance Item.
D)  Each Maintenance Item can have one or more Task List.
E)  Each Maintenance Item can have only one Technical Object.
.

Answer: A, B, C

A,B) Each Plan can have either time-based cycle or a counter.
C) Except if the call object is SES, IP41 can have one or more Maint.Item.
D) Only one Task list per Maintenance Item (if call object is Notification or Order), its optional.
E) Object list can have multiple Technical Objects.
 

Thursday, June 21, 2018

Question no 3550 : Calling Maintenance Notifications

In SAP PM as at ECC6.0 EhP6, note the SAP Menu, which of the following Maintenance Plan transactions creates Maintenance Notification when Scheduled ?

(more than one answers)

A)  IP41 Single Cycle Plan.
B)  IP42 Strategy Plan.
C)  IP43 Multiple Counter Plan.
D)  IP40 For Service Procurement.
E)  IP50 For Contract Item.
.

Answer: A, B, C

A, B, C) will call Maintenance Notification depending on MP Category select.
D) calls Service Entry Sheet.
E) IP50 is for Customer Service, therefore it can call Service Notification or Service Order



Wednesday, January 24, 2018

Question no 3500 : Maintenance Plan Scheduling

In SAP PM as at ECC6.0 EhP6, which of the following are Scheduling Indicator appropriate for the following scheduling scenario ?

Today's date: 24/01/2018 Due for the current monthly cycle maintenance 
Next planned date: 24/02/2018 which is always on the 24th of the month (next cycle)

(only one answer)

A)  Time.
B)  Time - Key Date.
C)  Time - Factory Calendar.
D)  Time - Fixed Cycle.
E)   Exact Cycle.
.

Answer: B

Only 3 scheduling indicators:
For scheduling, one month is always 30 days
1) Time (If Today's date scheduling called an Due Maintenance for 24/01/2018, next cycle is 30 days which is 23/02/2018.
2) Time-Key Date (If Today's date scheduling called an Due Maintenance is 24/01/2018, ext cycle is 24/01/2018 which is every 24th. 
3) Factory Calendar (If Today's date scheduling called an Due Maintenance is 24/01/2018, next cycle is counting 30 days from 24/01/2018 depending on the working days on the Factory Calendar)


Thursday, September 8, 2016

Question no 3247 : Call Objects for Plant Maitenance

In SAP PM as at ECC6.0 EhP6, the following are valid Call Objects for the Maintenance Plans in Plant Maintenance, select the correct ones ?

(more than one answers)

A)   Service Entry Sheet.
B)   Maintenance Order.
C)   Inspection Lot.
D)   Maintenance Notification.
E)   Confirmation Slip.
.

Tuesday, September 6, 2016

Question no 3246 : Call object External services for a Maintenance Plan

In SAP PM as at ECC6.0 EhP6, when a Call Object for a Maintenance Plan is a Service Entry Sheet, which of the following is Mandatory ?

(more than one answers)

A)  Technical Object.
B)  Settlement Order.
C)  Framework Purchase Order.
D)  Service Master or Service Description.
E)  Purchase Order Type.
.

Tuesday, August 30, 2016

Question no 3242 : Preventive Maintenance Plan Maintenance Item structure

In SAP PM as at ECC6.0 EhP6, the following regarding the Maintenance Item in a Preventive Maintenance Plan are Correct EXCEPT one ?

(only than one answer)

A)  A settlement rule can be entered in the Maintenance Item.
B)  A maintenance item can be assigned with one or more Technical Objects.
C)  A maintenance task list is optional in a Maintenance item even if the call object is a Maintenance Order.
D)  A maintenance must have at least one Maintenance item.
E)  Each maintenance item can have its own scheduling parameter.
.

Monday, June 27, 2016

Question no 3194 : Maintenance Plan Characteristics

In SAP PM as at ECC6.0 EhP7, which of the following are correct characteristics of a Maintenance Plan ?

(more than one answers)

A)   You can determine the settlement receiver in the Maintenance Plan Header.
B)   You can determine the settlement receiver in the Maintenance Plan Items.
C)   You can determine the settlement receiver in the Maintenance Plan Header or Maintenance Items but not both.
D)   You can determine the settlement receiver only in the Maintenance Plan Items.
E)   You can determine the settlement receiver in the Maintenance Plan Header and Maintenance Items but the Settlement Receiver in the Maintenance Item level will take precedence.

Sunday, June 12, 2016

Question no 3169 : Hierarchy in SAP Maintenance Planning

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following Maintenance Plan scenario do not allow the use of Hierarchy ?

(more than one answers)

A)   Single Cycle Plan.
B)   Time-Based Strategy Plan.
C)   Performance-Based Strategy Plan.
D)   Mutli-Counter Plan.
E)   External Services Plan.

Question no 3167 : Maintenance Planning for External Services Calls

In SAP ECC6.0 EhP6, which of the following are mandatory requirements when setting up a Maintenance Plant for External Services Calls ?

(more than one answers)

A)   General Ledger Account for Expenses posting.
B)   Settlement Rules.
C)   Settlement Order.
D)   Framework Purchase Order.
E)   Technical Object.
.

Sunday, April 17, 2016

Question 3120 : Reset Counter Start-in-Cycle

In SAP Plant Maintenance as at ECC6.0 EhP6, assume the following scenario and select the correct answer ?

A Single-Cycle Counter-Based Maintenance Plan with the following:
. Single-Cycle is 15000 hours
. Current counter reading at 30200 hours,
. Annual Estimate for the Counter is 30000 hours,
At the point of executing IP10, the current latest counter reading was at 30200 hours, and the Planner accidentally set the Start in Cycle counter to zero when performing an On-Line Scheduling.
(All due maintenance orders were already completed at the point of the scheduling and no other maintenance orders were released while future plans are at status 'On Hold')

(only one answer)

A)   No changes to existing plans.
B)   System would issue error message as the current counter is at 30200 hours where No Counter Re-set was found for the counter.
C)   2 Maintenance Orders are created.
D)   1 Maintenance Order is created.
E)    2 new 'On-Hold' scheduled lines are created.
.  

Saturday, April 16, 2016

Question no 3119 : Determining next due for Single-Cycle Counter Maintenance Plan

In SAP Plant Maintenance as at ECC6.0 EhP6, assume the following scenario and deduce the next due date for the Single-Cycle Counter Maintenance Plan

Measuring Point Annual Estimate 30000 km
Single-Cycle Plan at 15000 km
Current Counter reading at 5000 km

Todays data is 15.04.2016, what is the next due date as the Maintenance Plan is scheduled ?

(only one answer)

A)  15.06.2016
B)  15.07.2016
C)  15.08.2016
D)  15.09.2016
E)  15.10.2016
.

Thursday, April 14, 2016

Question no 3117 : Reference Object in Maintenance Plan

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following Reference Objects selections are provided by SAP for assignment to the Maintenance Plan Category ?

(more than one answers)

A)   Functional Location + Equipment + Assembly.
B)   Equipment + Assembly.
C)   Equipment only.
D)   Functional Location only.
E)   Assembly only.

Thursday, April 2, 2015

Question no 2913 : Service Procurement Maintenance Plan

In SAP PM ECC6.0 EhP6, identify the correct characteristics and contents of maintenance item of Maintenance Plan for Service Procurement, however one of the following is not the characteristics ?

(only one answer)

A)  Framework Purchase Order.
B)  Settlement Order.
C)  Cost Center.
D)  G/L Account.
E)  Service Master or Service Description.
.

Sunday, July 15, 2012

Question no 1615: Maintenance Plan for External Services

In SAP PM ECC6.0, the characteristics of Maintenance Plan for External Services are ?

(more then one answers)

A)   After approval of the Service Entry Sheet, the costs are debited into the Cost Center assigned in the Maintenance Plan.
B)   On maintenance due, Service Entry Sheet is generated against the Framework Purchase Order.
C)   The General Ledger for the Expenses account to be debited at approval of the Service Entry Sheet is defaulted from the Technical Object assigned in the Maintenance Plan.
D)   After approval of the Service Entry Sheet, the costs are debited into the Settlement Order assigned in the Maintenance Plan.
E)   A Purchase Order document type is entered in the Maintenance Plan for the Framework Order creation when maintenance is due.
.

Saturday, July 14, 2012

Question no 1614: Hiearchy in Maintenance Packages in Preventive Maintenance

In SAP PM ECC6.0, which of the following are true about Hiearchy in Maintenance Packages in Preventive Maintenance ?

(more then one answers)

A) If two packages with the same hierarchy are due at the same time, then both packages are performed.
B) If two packages have different hierarchies, only the package with the higher hierarchy is performed.
C) If two packages with the same hierarchy are due at the same time, then the package with the least operation time is performed.
D) If two packages have different hierarchies, only the package with the higher operation time is performed.
E) If two packages with the same hierarchy are due at the same time, no packages will are performed.
.

Friday, July 13, 2012

Question no 1613: Call Horizon

In SAP PM ECC6.0, When the Call Horizon is 0 %, ___________________ .

(only one answer)

A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) This is not possible as 0 (Zero) is not a valid entry.
.

Wednesday, July 11, 2012

Question no 1612: Call Horizon

In SAP PM ECC6.0, When the Call Horizon is 100 %, ___________________ .

(only one answer)

A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) The Call Date is at the end of the horizon of the scheduling period.
.