Unit 04 Scheduling
In setting up for process-oriented permits, you proceed with the following sequence:
(only one answer)
I Characteristics are created in the classification system with reference to fields in the order header.
II Assign the characteristics to a class of class type 049 (permits).
III The permit class must be assigned to a permit group.
IV Assign the permit class to the order type.
V A permit is created and classified.
(A) I, III, IV, V
(B) I, II, IV, V
(C) I, II, IV, V
(D) I, II, III, V
(E) I, II, III, IV, V
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.