This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Thursday, November 25, 2010

Question no : 659 PM Preventive Performance based concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Preventive maintenance tasks are due when a condition is outside a specific range. For example, the temperature is higher than 90 degree Celsius; which preventive maintenance types is most suitable ?
(only one answer)

(A) Time-based.
(B) Performance-based.
(C) Condition-based.
(D) Tolerance-based.
(E) Limit-based.
.

1 comment:

Note: Only a member of this blog may post a comment.