PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts
When entering a refurbishment order, you have to enter the following data:
(more than one answers)
(A) Material number to be refurbished.
(B) Quantity to be refurbished.
(C) Actual condition to be refurbished. (current valuation type)
(D) Target condition to be achieved. (desired valuation type)
(E) G/L account to be posted.
.
Answer: A, B, C, D
ReplyDelete