Question no : 721 PM Master Data BOM Assignment

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

The following BOM assignment are possible ?
(more than one answers)

(A) Direct assignment to the functional location.
(B) Direct assignment to the equipment.
(C) Assigning the material BOM to the equipment master as the Construction type.
(D) Assigning the material BOM to the functional location master as the Construction type.
(E) The same material BOM can be assigned to several equipment masters as the Construction type.
.