Question no 1323 : Strategy Group in PP

In SAP PP, the Strategy of Material Planning has which of the following assignment characteristics ?

(more then one answer)

A)   It can have only one main Strategy but multiple sub Strategy.
B)   It can be directly assigned to the Material Master at MRP 3 view.
C)   It can be assigned to the MRP area segment in the Material Master.
D)   It can be assigned to the MRP Group in the configuration.
E)   It can be assigned to the Materiel Group in the configuration.
.