In SAP PP, when performing the MRP run option with "Lead Time Scheduling", what is he correct reaction of the MRP Program ?
(only one answer)
A) If the Material does not have a Routing, the MRP program will be terminated immediately.
B) If the Material does not have a Routing, the MRP program will check for the MRP 2 view's "In-house Production time" and if it is not setup, the MRP program will be terminated immediately.
C) The MRP program will check for the MRP 2 view's "In-house Production time" and if it is not setup, it will then check if the material has a Routing and if no Routing is found, the MRP program will be terminated immediately.
D) The Routing is be looked at first, if not found; it will look for the Lot-Size dependent time data in the Work Scheduling view, and at last if not available; then it will check for the MRP 2 view's "In-house Production time"; if all were not setup then MRP program will be terminated immediately.
E) The Routing is be looked at first, if not found; it will look for the Lot-Size dependent time data in the Work Scheduling view, and at last if not available; then it will check for the MRP 2 view's "In-house Production time"; if all were not setup then MRP program will continue calculation without the detail scheduling.
.
Answer: E