TERP10 Unit 6 Manufacturing Execution
.
Which of the following assignments are mandatoryl in a Production Order ?
I) Operation.
II) Material component.
III) PRT.
IV) Trigger point.
V) DMS document.
(Select ONE best answer)
A) I only.
B) I, II only.
C) II, III.
D) I, II, III, IV, V.
E) Non of the above.
.
Answer: A
ReplyDelete