The configuration for setting the Release Strategy to be at the Header level of the Purchase Requisition (or sometimes called Overall Release) instead of item level release is done using which of the following setups:
(only one answer)
A) At the Plant Parameter.
B) At the Document type.
C) At the Client level.
D) At the item category level.
E) At the user Parameters.
.
Answer: B
ReplyDelete