In SAP LDM Engineering Change Management ECC6.0, which of the following are valid object types to be included in an Engineering Change Process ?
(more then one answers)
(A) Object Dependency.
(B) Bill of Material.
(C) Task List.
(D) Characteristics.
(E) Material.
.
(more then one answers)
(A) Object Dependency.
(B) Bill of Material.
(C) Task List.
(D) Characteristics.
(E) Material.
.
Answer: A, B, C, D, E
ReplyDeleteObject types that can be included in an Engineering Change are decided by SAP and cannot be added by the user. You can find list of the object type when maintaining the Engineering Change in CC01.
ReplyDelete