PLM300 Plant Maintenance
Unit 03 Technical Objects
In case a piece of equipment is linked with a material, when it is dismantled; the damaged piece of equipment is …..
(only one answer)
(A) is scraped.
(B) is placed in quarantine.
(C) is placed in a storage location.
(D) is not allowed re-installation to another functional location.
(E) none of the above.
.
Answer: C