Question no : 386 PP Execution Settlement Concepts

TERP10 Quiz Unit 06 Manufacturing Execution

Arrange the following elements in the correct steps of a Settlement Process.
I)      Calculate Overhead.
II)     Variance Calculation.
III)    WIP Calculation.
IV)    Settlement.
V)     Set Production order to TECO status.

A)     V, IV, II, III, I 
B)     V, II, III, IV, I
C)     IV, II, III, I, V
D)     V, II, III, I, IV  
E)     V, I, III, II, IV 
. 