In SAP PM ECC6.0 which of the following configuration parameters are available for Plant Maintenance Notification ?
(more then one answers)
A) Shop papers and Printer Control parameters.
B) Assignment of Partner Determination Procedure.
C) Settlement profile.
D) User Status profile.
E) Early number allocation for number range assignment.
.
(more then one answers)
A) Shop papers and Printer Control parameters.
B) Assignment of Partner Determination Procedure.
C) Settlement profile.
D) User Status profile.
E) Early number allocation for number range assignment.
.
Answer: A, B, D, E
ReplyDeleteC) Technically speaking, maintenance notification do not collect cost and settlement rules are not relevant therefore settlement profile assignment to the maintenance notification type is not necessary.
ReplyDelete