Question no 1571 : PM Work Center

In SAP PM, the Maintenance Work Center created must be _____________________.

(only one answer)

A)    Created for the Planning Plant.
B)    Created with the necessary Standard Value Keys.
C)    Created with the work center category with Application "I" for Plant Maintenance.
D)    Created with the number range provided in Plant Maintenance customization.
E)    Created with the correct validity period.
.

2 comments:

  1. without the appropriate work center category, the work center cannot be assigned to maintenance task list or maintenance order.

    ReplyDelete
  2. 1) A Maintenance Plant is used to create the work center instead of the Planning Plant.

    2) Plant maintenance do not use features such as setup time, machine time, and labour time (like those in PP). Therefore, the standard value key is irrelevant. Normally a standard value key of SAP0 is sufficient.

    3) The work center is one of those master data that does not have a number range and it is externally created. (as at ECC6.0 and before) There is also no validity period or engineering change possible for the work center master.

    ReplyDelete