In SAP APO-SNP, Which of the following best describes the Optimizer characteristics in SNP run ?
(more then one answers)
A) Quota Arrangement is used.
B) Prioritization rules applied.
C) Product Resources are evaluated Globally.
D) It produces the highest quality output compared to other SNP methods.
E) Costs factors are used.
.
This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
Showing posts with label SCM200 Unit 04 Supply Network Planning. Show all posts
Showing posts with label SCM200 Unit 04 Supply Network Planning. Show all posts
Monday, January 31, 2011
Saturday, January 29, 2011
Question no 947 : APO SNP Planning Methods
In SAP APO-SNP, Which of the following Planning methods looks at Resources only as a 2nd step calculation and locally as well ?
(only one answer)
A) Heuristic.
B) Genetic Algorithm.
C) Croston.
D) Optimizer.
E) CTM.
.
(only one answer)
A) Heuristic.
B) Genetic Algorithm.
C) Croston.
D) Optimizer.
E) CTM.
.
Question no 946 : APO SNP Planning Method identification
In SAP APO-SNP, _______________ is a rule-based method of extensive prioritization capabilities with finite and global planning of resources.
(only one answer)
A) Heuristic.
B) Genetic Algorithm.
C) Croston.
D) Optimizer.
E) CTM.
.
Friday, January 28, 2011
Question no 945 : APO SNP Planning Options
In SAP APO-SNP, Which of the following are Planning Possibilities in SNP ?
(more then one answer)
A) Heuristic.
B) Genetic Algorithm.
C) Croston.
D) Optimizer.
E) CTM.
.
(more then one answer)
A) Heuristic.
B) Genetic Algorithm.
C) Croston.
D) Optimizer.
E) CTM.
.
Question no 944 : APO SNP Deployment Process functions
In SAP APO-SNP, Which of the following are the functions of the Deployment Process ?
(more then one answer)
A) The result of the Deployment creates Stock Transfer Orders in SAP ECC.
B) The result of the Deployment creates Deliveries Orders in SAP ECC.
C) The result of the Deployment calculates the Safety Stocks in SAP ECC.
D) The result of the Deployment confirms stock transfers planned in the SNP run.
E) The result of the Deployment deletes the PPDS production orders.
.
(more then one answer)
A) The result of the Deployment creates Stock Transfer Orders in SAP ECC.
B) The result of the Deployment creates Deliveries Orders in SAP ECC.
C) The result of the Deployment calculates the Safety Stocks in SAP ECC.
D) The result of the Deployment confirms stock transfers planned in the SNP run.
E) The result of the Deployment deletes the PPDS production orders.
.
Tuesday, January 25, 2011
Question no 943 : APO SNP and PPDS Horizon
In SAP APO SNP, Check the understand of SNP and PPDS Horizons for the TRUE depictions ?
(more the one answers)
A) It is not possible to have the PPDS Horizon comes after the SNP Horizon.
B) PPDS planning runs only takes place within the PPDS Horizon.
C) The PPDS and SNP Horizons are CIFted to APO from R/3’s planning time fences in the material master MRP 1 view.
D) Pegging requirements are not possible in SNP planning results.
E) SNP run is purely based on Quantity and Periods.
.
(more the one answers)
A) It is not possible to have the PPDS Horizon comes after the SNP Horizon.
B) PPDS planning runs only takes place within the PPDS Horizon.
C) The PPDS and SNP Horizons are CIFted to APO from R/3’s planning time fences in the material master MRP 1 view.
D) Pegging requirements are not possible in SNP planning results.
E) SNP run is purely based on Quantity and Periods.
.
Question no 942 : APO SNP Planned Order characteristics
In SAP-APO SNP, Evaluate the following statements regarding SNP Planned Orders, select the statements which are CORRECT ?
(more then one answers)
A) SNP Planned orders can only be created and changed by SNP.
B) SNP Planned orders cannot b created by PP/DS but can be changed by it.
C) SNP Planned orders can only be created by the SNP run with an end date outside the SNP Horizon.
D) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the SNP Horizon.
E) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the PPDS Horizon.
(more then one answers)
A) SNP Planned orders can only be created and changed by SNP.
B) SNP Planned orders cannot b created by PP/DS but can be changed by it.
C) SNP Planned orders can only be created by the SNP run with an end date outside the SNP Horizon.
D) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the SNP Horizon.
E) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the PPDS Horizon.
.
Sunday, January 23, 2011
Question no 941 : APO Sequence of SNP Planning Process
In SAP APO SNP, which of the following depict the correct sequence of SNP Planning Process ?
(only one answer)
I) Execute TLB Run.
II) PP/DS Run.
III) Execute Deployment Planning Run.
IV) Execute SNP Run.
V) Release Demand Plan.
VI) Check/Resolve SNP Run Issues.
A) I, III, II, IV, VI, V.
B) V, I, III, IV, V, II.
C) V, VI, IV, III, I, II.
D) V, VI, IV, II, III, I.
E) V, IV, VI, II, III, I.
(only one answer)
I) Execute TLB Run.
II) PP/DS Run.
III) Execute Deployment Planning Run.
IV) Execute SNP Run.
V) Release Demand Plan.
VI) Check/Resolve SNP Run Issues.
A) I, III, II, IV, VI, V.
B) V, I, III, IV, V, II.
C) V, VI, IV, III, I, II.
D) V, VI, IV, II, III, I.
E) V, IV, VI, II, III, I.
Question no 940 : APO SNP Master Data
In SAP APO SNP, which of the following statements are TRUE regarding master data fro SNP ?
(more then one answers)
A) There is no need to generate SNP PDS for SNP PPM's for a successful SNP run.
B) SNP planning run can use PPDS PPMs.
C) Work centers can be excluded from SNP planning run by setting the relevant indicators in the relevant Work Centers.
D) SNP PPMs need not be the same in content as the PPDS PPMs.
E) You can Core-Interface directly from R/3 BOM and Routing to generated SNP PPMs.
.
Subscribe to:
Posts (Atom)