Question: Review Integration setup steps for EWM as a Distributed system (from an Application perspective)
Answer: The following Integration steps are for ECC6.0 EhP8 to S/4HANA 2023 Distributed EWM scenario, some of these steps may differ slightly depending on version used.
Steps (some are combined steps):
01. ECC - Enterprise Structure Configuration (Plant + SLoc + LE-WM)
02. ECC - Connection (Local/EWM/Dist.WM + Serialized Asynchronous qRFC)
03. ECC - Logical System (for both ECC and EWM and RFC Connection)
04. ECC - Generate Distribution Model (Data Channel activation for Objects from ECC to EWM)
05. ECC - Messages (Log and Register)
06. ECC - Delivery Split (Delivery Type or Warehouse basis)
07. EWM - Business System (Own EWM and ECC + commit to Logical System)
08 EWM - Enterprise Structure (EWM)
09. EWM - Business Partner (Plant, Ship-from and Ship-to)
10. EWM - EWM and Business Partner (Mapping for Custodian, STO etc)
11. EWM - qRFC ("Inbound" from which Source)
12. EWM - Availability Group
13. EWM - Map Availability Group to Plant + SLoc
14. EWM - Supply Chain Unit (Mapping to Business Partners)
14. EWM - Create Availability Group, related configuration and MM SLoc Mapping
15. ECC - Create new MM Storage Location for EWM processing
16. EWM - Create Availability Group, related configuration and MM SLoc Mapping
17. ECC to EWM - Material Master BDC Send to EWM
18. ECC to EWM - Simulate PO GR into EWM-based SLoc
**** when simulating exercise in Learning Hub ****
• Use your Group ID for all data to be created or when requested in the Exercises
• When creating anything else in SPRO, please code start with X, Y or Z and end with ## (your Group ID when Enroll to the LH)
• Do not change any other SPRO configuration at Client or 'given' Plant level (eg: Plant SPCW)
• Do not deactivate any Technical integration settings
See the following Blog Post for the step-by-step above:
**** Use the following data for the above exercise steps in the Blog ****
## is your assign Group number for the Exercises
• Step 15 MM Storage Location use XM##, YM##, or ZM##
• Step 16 EWM Stock Type "F6", "F7", "F8" or create X#, Y#, or Z#
• Step 17 Material T-EW03-## or copy to Material Z-EW03-## (Basic, Purchasing, Accounting views)
• Step 18 Receiving Shipping Point use XM##, YM##, or ZM##
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Review Integration setup steps for EWM as an Embedded system (from an Application perspective)
Answer: The following Integration steps are for S/4HANA 2023
Embedded EWM scenario, some of these steps may differ slightly depending on version used and further "Simplification" by SAP for S/4HANA Embedded scenarios.
Steps (some are combined steps):
01. EWM - Enterprise Structure Configuration (Plant + SLoc + LE-WM)
02. EWM - Connection (Local/EWM/Dist.WM + Serialized Asynchronous qRFC)
03. EWM - Logical System (for both ECC and EWM and RFC Connection)
04. EWM - Generate Distribution Model (Data Channel activation for Objects within Embedded EWM)
05. EWM - Messages (Log and Register)
06. EWM - Delivery Split (Delivery Type or Warehouse basis)
07. EWM - Business System (EWM to Logical System)
08. EWM - Business Partner (Plant, Ship-from and Ship-to) OPTIONAL
09. EWM - EWM and Business Partner (Mapping for Custodian, STO etc)
10. EWM - qRFC ("Inbound" within EWM)
11. EWM - Availability Group
12. EWM - Map Availability Group to Plant + SLoc
13. EWM - Supply Chain Unit (Mapping to Business Partners)
14. ECC - Create new MM Storage Location for EWM processing
15. EWM - Create Availability Group, related configuration and MM SLoc Mapping
16. ECC to EWM - Material Master BDC Send to EWM (NOT REQUIRED in Embedded EWM)
17. ECC to EWM - Simulate PO GR into EWM-based SLoc
See the following Blog Post for the step-by-step above: