--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Review of TS410 topics understanding.
https://froggysap.blogspot.com/2025/08/ts410-01-s4hana-overview-quiz.html
https://froggysap.blogspot.com/2025/08/ts410-02-s4hana-sap-fiori-quiz.html
https://froggysap.blogspot.com/2025/08/ts410-03-s4hana-system-wide-concepts.html
https://froggysap.blogspot.com/2025/08/ts410-04-s4hana-2023-record-to-report.html
https://froggysap.blogspot.com/2025/08/ts410-05-s4hana-2023-recruit-to-retire.html
https://froggysap.blogspot.com/2025/08/ts410-06-s4hana-2023-source-to-pay.html
https://froggysap.blogspot.com/2025/08/ts410-07-s4hana-2023-warehouse-and.html
https://froggysap.blogspot.com/2025/08/ts410-08-s4hana-2023-design-to.html
https://froggysap.blogspot.com/2025/08/ts410-09-s4hana-2023-lead-to-cash.html
https://froggysap.blogspot.com/2025/08/ts410-10-s4hana-2023-sap-project.html
https://froggysap.blogspot.com/2025/08/ts410-11-s4hana-2023-sap-enterprise.html
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: When using CS01 to create Material BOM, the "Item ID" is an internal number and always automatically generated from "00000001" and +1 for every BOM Material in the BOM; However, the Migration Cockpit however require the "Item ID" to be entered manually; why and can it be automated?
Answer: In a SAP Bill of Materials (BOM), the item ID is a unique identifier that serves to identify a specific component or item within the bill of materials. This identifier allows for clear and unambiguous identification and referencing of each component. All material in the same BOM will have a different number and always sequentially from the first item in the BOM started always as "00000001" and continue to plus +1 for every item in the BOM.
SAP's Migration Cockpit for Material BOM data conversion requires the "Item ID" to be an external number rather than internal number (when using CS01 or CS02). There is a documentation that states that SAP will update the field to be Internal number (same as CS01 or CS02), BUT it this is not available yet then I can suggest the following:
As the template is an Excel Spreadsheet, write a simple Macro that automatically generate "A0000001" and +1 for each subsequent item Material in the same BOM with the logic of "Material + BOM Usage + BOM Alternative. ONE simple way is to start with a numeric number of "0000001" then concatenate a Prefix of A to it to become "A0000001", then the Macro will add 1 to "0000002" plus add a Prefix A to it again; then the Macro continue with the rest of the BOM.
Note: the format for Leading zero in Excel should be the following (I think):- SAP "Resource Scheduling" - SAP PM Resource Scheduling is a functionality only available within SAP S/4HANA Asset Management that helps optimize the allocation of maintenance resources (personnel, equipment, tools) to maintenance tasks. It provides tools for planning, scheduling, and dispatching maintenance orders and operations, considering factors like work center capacity, skills, and availability.
- SAP Multiresource Scheduling (MRS) - is an add-on module that was introduced for ECC and now in S/4HANA, MRS enhances plant maintenance (PM) by providing a comprehensive solution for resource management and scheduling.
• Improved Resource Utilization: SAP MRS helps optimize resource allocation by considering factors like skills, availability, and location, minimizing idle time and maximizing productivity.• Real-time Visibility and Control: The system provides a centralized platform with real-time updates on resource availability and workload, allowing for proactive management and quick adjustments to changing needs.• Integration with Other SAP Modules: SAP MRS seamlessly integrates with other SAP modules like Plant Maintenance (PM), Project System (PS), and Customer Service (CS), ensuring a cohesive and integrated system.• Enhanced Operational Efficiency: By automating and optimizing resource allocation, SAP MRS reduces manual planning efforts and minimizes errors, leading to faster task completion and reduced costs.
- The word "Challan" generally refers to an official document, often a form, that is issued to record and collect a fine or penalty for a violation of rules or regulations, particularly traffic violations.
- It also refers to "Challan Subcontracting" or "Subcontracting Challan" as it is the requirement by INDIAN regulation for tracking subcontracting processing of an organization.
- The "Challan" is also widely known as the 57F4 challan, after the law under which it was defined up until the 2000 budget. This law has now been superceded by a new one, 57AC.
- The "Challan" is a document that the company use to issue and track subcontracting work. It allows the company to make sure that all the materials they have sent to the subcontractor for processing are returned. This "Challan" according to indian law if a company send the material to the subcontractor that has received that material within 180 day or if time exceded the 180 days, then the company has to pay the excise duty to the government.
- The Process in detail steps:
- A company is required to create "Challans" from Transfer Prders to accompany any materials that they send to subcontractors under rule 57AC. In this respect, they are an extended form of delivery note, with additional information about the excise duty on each material that you have supplied. Materials that are not liable to excise duty do not have to be included in the "Challan".
- As the Subcontractors return the finished goods to the company, it is required to document the record of the returns in the "Challan", to make sure that all are returned within the allotted time limit.
- If the finished goods returned to the company by the subcontractor are of substandard quality, then it is also a required to also create a subcontracting challan from the returns order.
Answer: Yes, it is possible to assign a Purchase Order despite the Internal Order is now in "CRTD" (Created) Status. The above screen shot is an IO freshly created with "CRTD" status AND immediately a PO created with Account Assignment Category "F" with the IO# assigned and the PO SAVED.
Problem: The settlement rule on the network or its activities might be missing, incorrect, or not pointing to the correct receiver (e.g., a WBS element).Solution: Verify the settlement rule on the network header and individual activities.Ensure the settlement rule is pointing to the correct receiver (e.g., a WBS element).Check if the settlement rule is generated automatically and if the generation strategy is correctly configured in the network type settings.If using a settlement profile, verify the allocation structure assigned to it and ensure it's compatible with your requirements.For automatic generation, the settlement profile should be set to require the WBS receiver and other receivers should be set to "Not Allowed".
Problem: The network type might be incorrectly configured, preventing proper settlement. For example, it might be an activity-assigned type when you need a header-assigned type, or vice versa.Solution: Check the network type configuration in SPRO (SPRO -> Project System -> Structures -> Operative Structures -> Network -> Define Network Types).Verify if the "Account Assignment" setting is correct for your scenario.If you're using a header-assigned network type, ensure all activities are assigned to the same WBS element.
Problem: The allocation structure assigned to the settlement profile might be incomplete or not include the relevant cost elements.Solution: Check the allocation structure assigned to your settlement profile (transaction OKO7).Ensure that all relevant cost elements are included in the allocation structure and that the structure is complete for your needs.Verify that the allocation structure is compatible with the settlement receiver (e.g., WBS element).
Problem: Check for other potential problems like missing or incorrect budget, incorrect posting periods, or issues with the status of the network or WBS element.Solution: Review the budget for the WBS element and ensure it's sufficient for settlement.Verify the posting periods and ensure they are open for settlement.Check the status of the network and WBS element (e.g., TECO for Technically Complete).Consider the settlement type used in the rule (PER, FUL, etc.) and its implications.
Problem: The system might not directly support settling planned costs from a network to a WBS element.Solution: If you need to distribute planned costs from a network to multiple WBS elements, you might need to use a distribution key.Consider using a different approach, such as settling costs from the network to a cost center and then to the WBS element.If you need to capitalize costs on a WBS element, you might need to use the RA method 13 to capitalize incremental costs as WIP.By systematically checking these areas, you can identify the root cause of the settlement issue and implement the appropriate solution.
1. Serial Number Profile:
• A serial number profile is assigned to a material in the material master. This profile determines how serial numbers are handled for that material.• The serial number profile can be configured to synchronize serial numbers with equipment numbers.• This synchronization can be set up to occur automatically upon goods receipt or other inventory transactions.
2. Synchronization of Serial Number and Equipment:
• When a material with a synchronized serial number profile is received, the system can automatically create an equipment master record for that specific serial number.• The equipment number and serial number are linked, allowing you to track the physical piece of equipment and its associated material.
3. Asset Management:
• Equipment records can be linked to asset records, allowing for the management of fixed assets.• This synchronization can be configured so that when an equipment record is created or changed, the corresponding asset record is automatically updated.• Conversely, you can also configure the system to create an asset record automatically when an equipment record is created.
4. Benefits of Synchronization:
• Improved Tracking: You can track the exact location, maintenance history, and other relevant information for each piece of serialized equipment.
• Enhanced Asset Management: Synchronizing equipment and asset records ensures that asset information is accurate and up-to-date.
• Reduced Data Entry: Automatic creation and updates of asset and equipment records minimize manual data entry, reducing errors and improving efficiency.• Better Decision Making: With accurate and readily available information, you can make better decisions about maintenance, repairs, and replacements.
4. Things to Consider:
• At Goods Receipt for Purchase Order with Serial + Equipment, while the serial number and equipment master are created, it's important to note that Assetization (creating the asset master record) is a separate process and not directly tied to the goods receipt. You may need to perform an asset acquisition posting to create the asset.
• At testing S/4HANA 2023, Goods Receipt of the Purchase Order can only result in Automatic creation of Material+Serial PLUS Equipment and synchronized as well. However, the Asset is not automatically generated as the "Object Type" field is not yet defaulted to the Equipment generation step at GR.
• At least as at S/4HANA 2023, if at GR is with the desire to FULLY AUTOMATE creation of Material+Serial + Equipment + Asset, then some "Modification" have to be done at point of GR to populate a desirable "Object Type" so that the system can use the combination of the "Object Type" + "Equipment Category" to find the Mapping to the Asset class and the synchronization direction configuraation to be able to perform this 3-in-1 step.
Click below to Blog Posts illustrating step by step:
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.