Question no 4054 : The effects of "BOM Explosion selection methods" data field no longer available in S/4 1909

In SAP Production Planning & Execution S/4 1909, note the following MRP 4 data view the Missing "BOM Explosion selection methods" data field (no longer available) and what is the effect of this Simplification scenario for PP, considering the Production Version wasn't setup for material F5 ?



(more than one answers)

A. Production Order creation Error.
B. MD01N will not be able to perform BOM Explosion for F5
C. MD02 will plan for Material F5 based on the existing BOM.
D. Manual Planned Order will require manual entry of materials.
E. Production Order creation require manual selection of BOM.
.

Answer: A, B, D

In S/4 1909, the Material Master MRP4 data view no longer have the "BOM Explosion selection methods" data field.
Production Version is mandatory for:
. MRP run via MD02 or MDBT
. MRP run via MD01N MRP Live
. Production Order creation
. Planned Order manual creation