External services scenario was introduced in R/3 4.0 (a long tome ago), from then till ECC6.0, SA design principle did not change much and I do not think it will. The delivery screen design concept is quite different from the other Purchasing documents.
SA supports material specific and plant specfic scenario. As at ECC6.0, external services are not yet possible.
ReplyDeleteExternal services scenario was introduced in R/3 4.0 (a long tome ago), from then till ECC6.0, SA design principle did not change much and I do not think it will. The delivery screen design concept is quite different from the other Purchasing documents.
ReplyDelete