Question no 1086 : Re-Order Point

In SAP MM Consumption-Based Planning, which of the following wrongly describes the characteristics of Re-Order Point planning MRP type ?

(more then one answers) 

A)    Only a "Fixed Lot Size" Lot-Sizing Key is possible.
B)    Both Manual and Automatic Re-Order Point Calculation is possible.
C)    It is designed for external procurement materials.
D)    The Scheduling Margin Key is not relevant for the material master.
E)    The Material cannot be included in a Bills of Material.
.