In SAP PM, which of the following are possible PRTs that can be assigned to a maintenance operation ?
(more then one answer)
A) Material PRT.
B) Document PRT.
C) Equipment PRT.
D) Miscellaneous PRT.
E) Measuring Point.
.
Answer: A, B, C, D, E
ReplyDelete