In SAP PM, when the equipment number created is synchronized to the serial number, this means which setting has been done ?
(only one answer)
A) The equipment category contains the synchronization setting.
B) The serial profile assigned to the material number contains the synchronization's setting.
C) During goods receipt, the synchronization setting is selected.
D) A configuration is done at the Plant Parameter in customizing.
E) The serial level in the material is set to ensure synchronization.
.
(only one answer)
A) The equipment category contains the synchronization setting.
B) The serial profile assigned to the material number contains the synchronization's setting.
C) During goods receipt, the synchronization setting is selected.
D) A configuration is done at the Plant Parameter in customizing.
E) The serial level in the material is set to ensure synchronization.
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.