This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Saturday, March 7, 2015

Question no 2694 : Usage field in the Inspection Plan Header

In SAP QM as at ECC6.0 EhP6, what is the use of the 'Usage' field found in the Inspection Plan Header ? 


(only one answer)

A)   Validate the use of the Inspection Plan for QM use and not PP or PM.
B)   Inspection Plan selection priority based on Inspection Plan application assign to the Material.
C)   Validate the selection of Inspection Plan for which Inspection Type.
D)   Validate the selection of Inspection Plan for which Inspection Origin.
E)   Use together with the Status field for releasing the Inspection Plan for production. use.

2 comments:

  1. IMG - QM - Quality Inspection - Inspection Lot Creation - Maintain Inspection Type, in each each Inspection Type you can find an assignment of a Task list Usage.

    ReplyDelete

Note: Only a member of this blog may post a comment.