In SAP MM, which of the following are true about the use of MRP Profile.
(more then one answers)
A) It can be assigned the the Plant MRP view of a material which was already created earlier without the MRP Profile.
B) It can be changed to another MRP Profile even if the material was already created with a MRP Profile.
C) It can be reset (removed) from the MRP view assigned of a material.
D) You can change the contents of the MRP Profile master data from within the Material Master.
E) You can run a Usage List (Where-Used List) of MRP Profile from within the Material Master.
(more then one answers)
A) It can be assigned the the Plant MRP view of a material which was already created earlier without the MRP Profile.
B) It can be changed to another MRP Profile even if the material was already created with a MRP Profile.
C) It can be reset (removed) from the MRP view assigned of a material.
D) You can change the contents of the MRP Profile master data from within the Material Master.
E) You can run a Usage List (Where-Used List) of MRP Profile from within the Material Master.
Answer: A, B, C, D, E
ReplyDeleteOne can navigate from a Master data to another master data, but most likely a common design feature is only to display and not to change. In this case, When you navigate from the Material Master to the MRP Profile, you can change it if you have also the necessary authorization.
ReplyDeleteAssighment and removal of the MRP Profile to a material master is quite flexible.