In SAP MM, which of the following are the correct usage of the MRP Profile in the Material Master ?

(more then one answers)

A)    If a Material Master has been assigned a MRP Profile, the assignment can be removed.
B)    If a Material Master has been assigned a MRP Profile, the assignment can be changed.
C)    If a Material Master is not yet assigned a  MRP Profile, a new assignment is possible.
D)    If a Material Master has been assigned a MRP Profile, a second profile can be assigned.
E)    All of the above.
.