Question no 1145 : Quota Arrangement Usage

In SAP MM, please check the correct description of the application of the Quota Arrangement ?

(more then one answers)

A)    The Quota Arrangement usage can be set at the Purchasing view or the MRP 2 view.
B)     A Plant specific configuration is required in the Customizing to ensure the mandatory setup of the Quota Arrangement master file for source determination for all materials in a Plant.
C)     Supplying Plant is a possible source in the Quota Arrangement.
D)     The Quota Arrangement has a valid period.
E)     The Quota Arrangement is always created as plant specific.
.