In SAP PP Long Term Planning, which of features that Long Term Planning is capable of but the Operative MRP does not have ?
(only one answer)
A) Creation of Planned Orders.
B) Firming a Planned Order.
C) Ability to do Lead-Time Scheduling.
D) Recognize the Material Master Strategy Group.
E) Switching a Re-order point material to Dependent requirement.
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.