In SAP Production Planning & Execution as at S/4 1909, MRP Controller is Mandatory when creating which of the following in Standard SAP?
(more than one answer)
A) Creating Material Master with MRP 1 data view with a valid MRP Type for Planning.
B) Creating a Storage Location master.
C) Create a Production Supply Area.
D) Create a Classic Control Cycle for Production Replenishment with Production Order.
E) All of the above.
.
Answer: A, D
(more than one answer)
A) Creating Material Master with MRP 1 data view with a valid MRP Type for Planning.
B) Creating a Storage Location master.
C) Create a Production Supply Area.
D) Create a Classic Control Cycle for Production Replenishment with Production Order.
E) All of the above.
.
Answer: A, D