In SAP QM as at S/4 1909, which of the following QM objects an be changed using a Change Number ?
(more than one answers)
A) Inspection Plan.
B) Material Specification.
C) Master Inspection Characteristics.
D) Inspection Method.
E) Reference Operation set.
Answer: A, E
(more than one answers)
A) Inspection Plan.
B) Material Specification.
C) Master Inspection Characteristics.
D) Inspection Method.
E) Reference Operation set.
Answer: A, E
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.