This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Sunday, March 8, 2015

Question no 2714 : Dynamic Modification option

In SAP QM ECC6.0 EhP6, what are the effects of Dynamic Modification set at 'lot creation' ?

(more then one answers)

A)   The Quality Level will be updated at the inspection lot creation with the assumption the lot will be accepted.
B)   The Quality Level is updated at source inspection.
C)   The Quality Level will not be influenced by subsequent Usage Decision.
D)   If dynamic modification is carried out at lot creation and the inspection lot is subsequently rejected, the system updates the quality level again when the usage decision is made.
E)   The Quality Level will be updated at the inspection lot creation based on the previous inspection lot results.
.

2 comments:

  1. For dynamic modification at lot creation , the quality level is updated when an inspection lot is created . The system assumes that the forthcoming inspection will lead to an acceptance of the inspection lot or characteristic.

    An inspection lot, which is created immediately after the quality level is updated, uses the information in the updated quality level without a usage decision having been made.

    If dynamic modification is carried out at lot creation and the inspection lot is subsequently rejected, the system updates the quality level again when the usage decision is made. The new inspection stage is used by the system to calculate the sample sizes for the next inspection lot.

    ReplyDelete

Note: Only a member of this blog may post a comment.