This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Saturday, March 7, 2015

Question no 2692 : Dynamic Modification Levels

In SAP QM as at ECC6.0 EhP6, Dynamic Modification Levels setup in the Inspection Plan in the SAP QM module can exist in which of the following levels ?

(more than one answers)

A) Dynamic modification at Inspection Characteristics level which is assigned to an Operation. 
B) Dynamic modification at Operation level for all Inspection Characteristics assigned to it.
C) Dynamic modification at Inspection Plan Header level.
D) Dynamic modification at Inspection Lot Level.
E) Dynamic modification at configuration for the entire client.
.

2 comments:

  1. You can vary the inspection scope using dynamic modification rules. You can store a dynamic modification rule in one of the following places:
    . In the inspection plan at the header level
    . In the inspection plan at the inspection characteristic level
    . In the inspection setup of the material master record at the inspection type level

    In the Inspection Plan, the DMR is set at the header or each inspection characteristics.

    ReplyDelete

Note: Only a member of this blog may post a comment.