In SAP PP, what are the possible options of MRP run ?
(more then one answers)
A) Executing MRP run without accessing the Routing.
B) Single-item Single-level MRP run.
C) Source determination during the MRP run.
D) Accessing the Quota Arrangement during the MRP run.
E) Without calculating capacity.
.
(more then one answers)
A) Executing MRP run without accessing the Routing.
B) Single-item Single-level MRP run.
C) Source determination during the MRP run.
D) Accessing the Quota Arrangement during the MRP run.
E) Without calculating capacity.
.
Answer: A, B, C, D, E