In SAP PP, a Production order ____________________ .
(more then one answers)
A) Cannot be created for without a material master.
B) Must have a minimum of one operation.
C) Can be created without a BOM.
D) Must have a minimum of one component.
E) Cannot be released until a BOM and Routing is entered.
.
Answer: B, C
ReplyDeleteEven there is no Routing, the Production Order will be created with one operation. However, when a BOM is not found, the Production Order can proceed without any components.