Question no 1039 : Non-Valuated Material Master

In SAP MM, a non-valuated material do not require stock keeping in the Plant, what are the benefits of creating a non-valuated material scenario as a material master ?

(more then one answers)

A)    MRP planning for the material is possible.
B)    Available of Consumption History postings.
C)    Default data from material master to Purchasing document.
D)    Requirement of Material to be in the Bills of Materials.
E)    Such that Forecasting of the Material is possible.
.