In SAP PP as at ECC6.0 EhP6, which of the following can be assigned with the Backflushing control indicator or the Backflushing indicator ?
(more than one answers)
A) Material Master MRP2 data view.
B) Material Master Work Scheduling data view.
C) Routing Header.
D) Routing Operation.
E) BOM Item detail.
.
Answers: A, D
Backflushing control indicator in the Material Master MRP2 data view.
Backflushing indicator in the Work Center or Routing Operation.
(more than one answers)
A) Material Master MRP2 data view.
B) Material Master Work Scheduling data view.
C) Routing Header.
D) Routing Operation.
E) BOM Item detail.
.
Answers: A, D
Backflushing control indicator in the Material Master MRP2 data view.
Backflushing indicator in the Work Center or Routing Operation.