Question no 3794 : Quality Assurance Agreement
In SAP QM for MM as at ECC6.0 EhP6,which of the following necessitates the Quality Assurance Agreement for Procurement of a Material ?
(only one answer)
A) Quality Info Record.
B) Inspection Type detail in the Material Master.
C) QM Control Key in the Material Master.
D) Purchasing Info Record parameter.
E) Source List.
.
Answer: C
The QM Control Key configuration decides it.
(only one answer)
A) Quality Info Record.
B) Inspection Type detail in the Material Master.
C) QM Control Key in the Material Master.
D) Purchasing Info Record parameter.
E) Source List.
.
Answer: C
The QM Control Key configuration decides it.
Tuesday, January 26, 2021
Question no 3793 : Inspection Skip for Certified Vendors
In SAP QM as at ECC6.0 EhP6, which of the following settings are TRUE about Inspection Lot Skip for Certified Vendors ?
(more than one answers)
A) Assign QM system requirement for Vendors in the Material Master QM data view.
B) Assign the acquired QM system in the Vendor Master.
C) Assign the acquired QM system in the Quality Info Record.
D) Assign QM system requirement for Vendors in the Inspection Type Detail in the Material Master QM data view.
E) Assign the acquired QM system in the Purchasing Info Record.
.
Answers: A, B, C
If you want to define a QM system and be able to control inspection skips, you must maintain various master records:
You define the requirements for a vendor's QM system in the material master record .
You specify the vendor's QM system (which is identified in Customizing as a certified system) in the vendor master record or the quality info record . If you enter the QM system in the vendor master record, the inspection skip applies to all of the vendor's materials. If you enter the QM system in the quality info record, the inspection skip only applies to a specific combination of material, vendor, and plant.
In the quality info record , you can override an inspection skip that has been defined in Customizing. For example, if you want to force inspections for a certain combination of material, vendor, and plant, you can specify this in the corresponding quality info record.
(more than one answers)
A) Assign QM system requirement for Vendors in the Material Master QM data view.
B) Assign the acquired QM system in the Vendor Master.
C) Assign the acquired QM system in the Quality Info Record.
D) Assign QM system requirement for Vendors in the Inspection Type Detail in the Material Master QM data view.
E) Assign the acquired QM system in the Purchasing Info Record.
.
Answers: A, B, C
If you want to define a QM system and be able to control inspection skips, you must maintain various master records:
You define the requirements for a vendor's QM system in the material master record .
You specify the vendor's QM system (which is identified in Customizing as a certified system) in the vendor master record or the quality info record . If you enter the QM system in the vendor master record, the inspection skip applies to all of the vendor's materials. If you enter the QM system in the quality info record, the inspection skip only applies to a specific combination of material, vendor, and plant.
In the quality info record , you can override an inspection skip that has been defined in Customizing. For example, if you want to force inspections for a certain combination of material, vendor, and plant, you can specify this in the corresponding quality info record.
Monday, January 25, 2021
Question no 3792 : Exception Messages in MD04
In SAP PP as at ECC6.0 EhP6, which of the following are TRUE about Exception Messages in MD04 ?
(more than one answers)
A) Exception Messages can only be generated via MRP run.
B) Exception Messages can be de-activated in the IMG.
C) Exception Messages in the MRP List can be different than that of MD04.
D) Exception Messages can be Re-Grouped in Exception Message Grouping in the IMG.
E) Exception Messages in the MRP List are Static until the next MRP run.
.
Answers: B, C, D, E
A) Exception Messages need not require MRP run to appear in MD04, example changing dates of the Demand beyond the Tolerances (if available).
B) All Exception Messages can be de-activated in the IMG.
C) Certain Exception Messages are different in the MRP List, eg: Exception Messages when new Planned Orders are created can be seen in MPR List and not MD04.
D) All Exception Messages can be re-grouped in IMG but he number of Groups are fixed.
E) All data in the MRP List including Exception Messages are Fixed until the next MRP run.
(more than one answers)
A) Exception Messages can only be generated via MRP run.
B) Exception Messages can be de-activated in the IMG.
C) Exception Messages in the MRP List can be different than that of MD04.
D) Exception Messages can be Re-Grouped in Exception Message Grouping in the IMG.
E) Exception Messages in the MRP List are Static until the next MRP run.
.
Answers: B, C, D, E
A) Exception Messages need not require MRP run to appear in MD04, example changing dates of the Demand beyond the Tolerances (if available).
B) All Exception Messages can be de-activated in the IMG.
C) Certain Exception Messages are different in the MRP List, eg: Exception Messages when new Planned Orders are created can be seen in MPR List and not MD04.
D) All Exception Messages can be re-grouped in IMG but he number of Groups are fixed.
E) All data in the MRP List including Exception Messages are Fixed until the next MRP run.
Saturday, January 23, 2021
Thursday, January 21, 2021
Wednesday, January 20, 2021
Question no 3791 : MRP without Firming Type
In SAP PP as at ECC6.0 EhP6, which of the following MRP Type is not set with a Firming Type for Re-Scheduled Out and/or Firming within the Time Fence ?
(only one answer)
A) PD.
B) P1.
C) P2.
D) P3.
E) P4.
.
Answer: PD
P1, P2, P3, P4 all set with Firming Type indicator for Procedure MRP
(only one answer)
A) PD.
B) P1.
C) P2.
D) P3.
E) P4.
.
Answer: PD
P1, P2, P3, P4 all set with Firming Type indicator for Procedure MRP
M1, M2, M3, M4 also set with Firming Type indicator Procedure MPS
The Firming Type indicator contains 2 actions:
. new Planned Orders within the Time Fence will be Scheduled Outside the Time Fence.
. Auto Firming of existing Planning Orders coming into the Time Fence.
Tuesday, January 19, 2021
Question no 3790 : Plan MRP Regularly
In SAP MM/PP as at ECC6.0 EhP6, which of the following settings allow a material planned on a regular basis by MRP, even when there was no MRP
relevant change for this material and the planning file was not set ?
(more than one answers)
A) Run a regenerative planning run (processing key NEUPL).
B) Run a net change planning run (processing key NETCH).
C) Run a net change in the planning horizon planning run (processing key NETPL).
D) Setting “plan regularly” on the MRP type.
E) Setting "plan regularly" on the Plant Parameter.
.
Answers: A, D
A) One of the possible solution is to run a regenerative planning run (processing key NEUPL), however, with this key all the materials will be planned and this is a frequent cause of performance issues.
D) MRP type on the customizing transaction OMDQ where the flag “plan regularly” is set on customizing.
(more than one answers)
A) Run a regenerative planning run (processing key NEUPL).
B) Run a net change planning run (processing key NETCH).
C) Run a net change in the planning horizon planning run (processing key NETPL).
D) Setting “plan regularly” on the MRP type.
E) Setting "plan regularly" on the Plant Parameter.
.
Answers: A, D
A) One of the possible solution is to run a regenerative planning run (processing key NEUPL), however, with this key all the materials will be planned and this is a frequent cause of performance issues.
D) MRP type on the customizing transaction OMDQ where the flag “plan regularly” is set on customizing.
Monday, January 18, 2021
Question no 3789 : Consumption Based Planning
In SAP MM/PP as at ECC6.0 EhP6, which of the following are not Consumption Based Planning ?
(more than one answers)
A) ReOrder Point Planning.
B) Forecast-Based Planning.
C) Time-Phased Planning.
D) MRP.
E) Long Term Planning.
.
Answers: D, E
MRP and LTP are for PP dependent-independent requirement.
(more than one answers)
A) ReOrder Point Planning.
B) Forecast-Based Planning.
C) Time-Phased Planning.
D) MRP.
E) Long Term Planning.
.
Answers: D, E
MRP and LTP are for PP dependent-independent requirement.
Saturday, January 16, 2021
Thursday, January 14, 2021
Wednesday, January 13, 2021
Question no 3787 : MRP Firming Type
In SAP PP MRP as at ECC6.0 EhP6, which of the following are the characteristics of a Firming Type assigned to the MRP Type ?
(more than one answer)
A) Procurement proposals that move into the planning time fence are firmed automatically.
B) Procurement proposals that move into the planning time fence are not firmed automatically.
C) All procurement proposals that are necessary for requirements coverage are displaced to the end of the planning time fence.
D) The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
E) All of the above.
.
Answers: A, B, C, D, E
The following firming types are available:
Firming type 0
The system does not firm procurement proposals automatically.
Firming type 1
Procurement proposals that move into the planning time fence are firmed automatically , as soon as their date lies at least one day before the end date of the planning time fence. The date of new procurement proposals that are created in the planning time fence is displaced to the end of the planning time fence . These new procurement proposals are not firmed.
Firming type 2
Procurement proposals that move into the planning time fence are firmed automatically , as soon as their date lies at least one day before the end date of the planning time fence. The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
Firming type 3
Procurement proposals that move into the planning time fence are not firmed automatically by the system. All procurement proposals that are necessary for requirements coverage are displaced to the end of the planning time fence .
Firming type 4
Procurement proposals that move into the planning time fence are not firmed automatically by the system. The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
(more than one answer)
A) Procurement proposals that move into the planning time fence are firmed automatically.
B) Procurement proposals that move into the planning time fence are not firmed automatically.
C) All procurement proposals that are necessary for requirements coverage are displaced to the end of the planning time fence.
D) The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
E) All of the above.
.
Answers: A, B, C, D, E
The following firming types are available:
Firming type 0
The system does not firm procurement proposals automatically.
Firming type 1
Procurement proposals that move into the planning time fence are firmed automatically , as soon as their date lies at least one day before the end date of the planning time fence. The date of new procurement proposals that are created in the planning time fence is displaced to the end of the planning time fence . These new procurement proposals are not firmed.
Firming type 2
Procurement proposals that move into the planning time fence are firmed automatically , as soon as their date lies at least one day before the end date of the planning time fence. The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
Firming type 3
Procurement proposals that move into the planning time fence are not firmed automatically by the system. All procurement proposals that are necessary for requirements coverage are displaced to the end of the planning time fence .
Firming type 4
Procurement proposals that move into the planning time fence are not firmed automatically by the system. The system does not create any new procurement proposals within the planning time fence; that means, the system does not balance the shortage situation in the planning time fence.
Tuesday, January 12, 2021
Question no 3786 : MF50
In SAP PP as at ECC6.0 EhP6, the T-Code MF50 Planning Table can be used for the following ?
(more than one answers)
A) Read "Active" Planned Independent Requirements.
B) Show Production Order quantities.
C) Show Make-to-Order scenario quantities.
D) Show Make-to-Stock scenario quantities.
E) Show capacities.
.
Answers: A, B, C, D, E
MF50 interface shows a "spreadsheet-like" tabular format to view the Planning data that can show MTO or MTS scenario data as well as Capacities data
(more than one answers)
A) Read "Active" Planned Independent Requirements.
B) Show Production Order quantities.
C) Show Make-to-Order scenario quantities.
D) Show Make-to-Stock scenario quantities.
E) Show capacities.
.
Answers: A, B, C, D, E
MF50 interface shows a "spreadsheet-like" tabular format to view the Planning data that can show MTO or MTS scenario data as well as Capacities data
Monday, January 11, 2021
Question no 3785 : Collective Production Orders
In SAP PP as at ECC6.0 EhP6, which of the following is used to activate Collective Production Orders ?
(only one answer)
A) Special Procurement Key.
B) Production Scheduler Profile.
C) An indicator in the Material Master Work Scheduling data view.
D) MRP Plant parameter.
E) MRP Group parameter.
.
click "1 comment" to view Suggested Solution
(only one answer)
A) Special Procurement Key.
B) Production Scheduler Profile.
C) An indicator in the Material Master Work Scheduling data view.
D) MRP Plant parameter.
E) MRP Group parameter.
.
click "1 comment" to view Suggested Solution
Thursday, January 7, 2021
Wednesday, January 6, 2021
Question no 3784 : Material Status for Control of Material Requirements
In SAP PP as at ECC6.0 EhP6, which of the following are Controls possible for Material Requirements via the Material Status ?
(more than one answers)
A) Planned Independent Requirement maintenance.
B) Forecasting run.
C) MRP run.
D) Long Term Planning run.
E) SOP Planning table maintenance.
.
click "1 comment" to view possible soultion
(more than one answers)
A) Planned Independent Requirement maintenance.
B) Forecasting run.
C) MRP run.
D) Long Term Planning run.
E) SOP Planning table maintenance.
.
click "1 comment" to view possible soultion
Tuesday, January 5, 2021
Question no 3783 : Master Inspection Characteristics Assignment
In SAP QM as at ECC6.0 EhP6, which of the following can the Master Inspection Characteristics can be assigned to ?
(more than one answers)
A) Routing Operations.
B) Recipe Phase Operations.
C) Maintenance Task List Operations.
D) Material Specification.
E) Inspection Plan Operations.
.
click "1 comment" for suggested solution
(more than one answers)
A) Routing Operations.
B) Recipe Phase Operations.
C) Maintenance Task List Operations.
D) Material Specification.
E) Inspection Plan Operations.
.
click "1 comment" for suggested solution
Monday, January 4, 2021
Question no 3782 : Inspection Characteristics in Routing
In QM as at ECC6.0 EhP6, Inspection Characteristics assigned to the Routing is for which Inspection Type purpose ?
(only one answer)
A) Inspection Type "01".
B) Inspection Type "02".
C) Inspection Type "03".
D) Inspection Type "04".
E) Inspection Type "05".
.
click "1 comment" to view Possible Solution
(only one answer)
A) Inspection Type "01".
B) Inspection Type "02".
C) Inspection Type "03".
D) Inspection Type "04".
E) Inspection Type "05".
.
click "1 comment" to view Possible Solution