This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
Wednesday, June 29, 2022
Monday, June 27, 2022
Question no 3937 : S/4 Material Master MRP4 data view changes
In S/4 1809, which of the following are the changes in the MRP data views in the Material Master ?
(More than one answers)
A) Storage Location data view in MRP4 is no longer possible.
B) MRP area is now Mandatory.
C) BOM selection method in MRP4 view is no longer available.
D) Quota Arrangement Usage is no longer available.
E) MRP Group usage is no longer useful.
Answers: A, C, D
The following findings as at S/4 1809:
(More than one answers)
A) Storage Location data view in MRP4 is no longer possible.
B) MRP area is now Mandatory.
C) BOM selection method in MRP4 view is no longer available.
D) Quota Arrangement Usage is no longer available.
E) MRP Group usage is no longer useful.
Answers: A, C, D
The following findings as at S/4 1809:
A. MRP 4 view - Storage Location setting is no longer available
B. MRP 1 view - MRP area is recommended to replace to Storage Location MRP feature
C. MRP 4 view - BOM Selection method no longer available
D. MRP 2 view - Quota Arrangement Usage field is no longer needed
E. MRP 1 view - MRP Group is still relevant.
Friday, June 24, 2022
Wednesday, June 22, 2022
Question no 3936 : Advanced Planning Resource Master naming convention
In S/4 1809, the automatic naming of the Advanced Planning Resource when it is automatically generally due to Advance Planning activation of the Work Center; the naming convention of the APO Resource master includes the following ?
(more than one answers)
A) Plant code.
B) Task List Type.
C) W.
D) Capacity Category.
E) Capacity Planner.
.
Answers: A, C, D
Work Center WC1 created in Plant 1000 with Capacity Category 001 and 002.
In SAP becomes
WWC1_1000_001 and WWC1_1000_002 as APO Resources
(more than one answers)
A) Plant code.
B) Task List Type.
C) W.
D) Capacity Category.
E) Capacity Planner.
.
Answers: A, C, D
Work Center WC1 created in Plant 1000 with Capacity Category 001 and 002.
In SAP becomes
WWC1_1000_001 and WWC1_1000_002 as APO Resources
Saturday, June 18, 2022
Wednesday, June 15, 2022
Saturday, June 11, 2022
Wednesday, June 8, 2022
Question no 3935 : MRP Live
In SAP S/4 1809, the FIORI based "MRP Live" contains which of the following selection criteria to filter materials for Planning ?
(More than one answers)
A) Material Group.
B) Product Group.
C) Material Type.
D) Materials.
E) MRP Group.
.
Answers: B, D
For the classic ECC MRP via MD01 (online) or MDBT (background), the selection criteria are:
(More than one answers)
A) Material Group.
B) Product Group.
C) Material Type.
D) Materials.
E) MRP Group.
.
Answers: B, D
For the classic ECC MRP via MD01 (online) or MDBT (background), the selection criteria are:
Scope of Plan (sequencing Plants and/or MRP Areas)User Exit (Abap routine to select Materials for the MRP run)
For the new S/4 MRP Live (transaction code: MD01N which can be setup for Immediate or Schedule Runs), the selection criteria are (via the Planning Scope selection):
Plants (one or more)Material (one or more)Product Groups (one or more)MRP Controller (one or more)Material Scope (MPS or MRP Materials or Both)
One additional advantages of the MRP Live vs the classic MRP is that MRP Live can also perform planning run for PPDS Materials (Materials activated for Advanced Planning).
Saturday, June 4, 2022
Wednesday, June 1, 2022
Subscribe to:
Posts (Atom)