Question no 3602 : Manufacturing Strategy

In SAP PP as at ECC6.0 EhP6, consider the following statement by the planner "The Final Assembly of some of the Products can only begin when the Customer Order arrives but the Lead Time for these Customer Orders are too short and Forecast is necessary for the rest of the Components with longer procurement lead times".

Which of the following Strategy would you recommend ?

(only one answer)

A)  Strategy 10.
B)  Strategy 20.
C)  Strategy 30.
D)  Strategy 40.
E)  Strategy 50.
.

Answer: E

Strategy 50 Planning without Final Assembly

Saturday, November 24, 2018

Question no 3602 : Event-Driven Production

In SAP PP as at ECC6.0 EhP6, if a manufacturing facility has the following characteristics:
. relatively constant rate of demand
. no need for MRP run
. use demand to drive supply flow through production

(only one answer)

A)  Process Order.
B)  Production Order.
C)  Production Campaign.
D)  Kanban.
E)  Repetitive Manufacturing.
.

Answer: D

Kanban

Friday, November 23, 2018

Question no 3601 : Production Methods

In SAP PP as at ECC6.0 EhP6, if a manufacturing facility has the following characteristics:
. dedicated production line
. very high product stabilities
. reduce of goods movements to reduce costs
. high repetition of production schedule
Which of the following Production Methods would you recommend ?

(only one answer)

A)  Process Order.
B)  Production Order.
C)  Production Campaign.
D)  Kanban.
E)  Repetitive Manufacturing.
.

Answer: E

PP-REM, Repetitive Manufacturing

Tuesday, November 20, 2018

Question no 3600 : Defaulting Order Type in the Maintenance Item

In SAP PM as at ECC6.0 EhP6, which of the following are used to default the Order Type in the Maintenance Item ?

(only one answer)

A)   Planning Plant.
B)   Planning Plant + Planner Group.
C)   Planner Group.
D)   Planning Plant + Maint.Work Center.
E)   Planning Plant + Planner Group + Maint.Work Center.
.

Answer: B

IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item

Saturday, November 17, 2018

Question no 3599 : Maintenance Plan Structure

In SAP PM as at ECC6.0 EhP6, take the correct statements regarding Maintenance Plan.

(more than one answers)

A)  All Maintenance Plan can have one or more Maintenance Items.
B)  All Maintenance Items must be assigned with a Task List.
C)  All Maintenance Items must be at least one Reference Object.
D)  All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E)  All Maintenance Plan must have at least one Maintenance Item for scheduling.
.

Answer: D, E

A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.

Monday, November 12, 2018

Question no 3598 : Call Object by Maintenance Plan Category

In SAP PM as at ECC6.0 EhP6, which of the following are possible Call Objects via Maintenance Plan Category ?

(more than one answers)

A)  Maintenance/Service Notification.
B)  Maintenance/Service Order.
C)  Service Entry Sheet.
D)  Inspection Notification.
E)  Inspection Lot.
.

Answer: A, B, C, E

Calling Inspection Lot is a function of QM. (but it is still possible via the same MP Category configuration)

Friday, November 9, 2018

Question no 3597 : Maintenance Plan Category

In SAP PM as at ECC6.0 EhP6, which of the following are configuration parameters possible via the Maintenance Plan Category ?

(more than one answers)

A)  Maintenance Plan number range.
B)  Maintenance Item number range.
C)  Call Object.
D)  Change Document.
E)  Reference Object.
.

Answer: A, C, D, E

IMG - PM/CS - Maint.Plan/WorkCenter/TaskList - Maint.Plans - Set MP Category

Tuesday, November 6, 2018

Question no 3596 : Source List in Source Determination in MRP Run

In SAP PP and MM as at ECC6.0 EhP6, MRP run uses the Source List to determine which of the following in an MRP run ?

(more than one answers)

A)   Production version.
B)   Vendor.
C)   Contract.
D)   Quantity split.
E)   All of the above.

Answer: B, C

ME01
However, Quota Arrangement will allow assignment of Production Version and Ratio for sources for splitting quantities at MRP run.

Saturday, November 3, 2018

Question no 3595 : Quota Arrangement in Source Determination in MRP Run

In SAP PP and MM as at ECC6.0 EhP6, MRP run uses the Quota Arrangement to determine which of the following in an MRP run ?

(more than one answers)

A)   Production version.
B)   Vendor.
C)   Supplying Plant.
D)   Quantity split.
E)   All of the above.

Answer: A, B, C, D, E

MEQ1