This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, March 31, 2015

Question no 2901 : Number Ranges in PM/CS Technical Objects

In SAP PM/CS ECC6 EhP6 number range for technical objects?

(more than one answers)

A)  Functional Location can have either internal or external number range.
B)  An Equipment Category can have only either internal or external number range but not both.
C)  Measuirng Points only have internal number range.
D)  Serial number may follow the number range of the Equipment generated.
E)  A material number can be internal number or external number.
.

Question no 2900 : Replace Counter

In SAP PM/CS as at ECC6.0 EhP6, which of the following regarding Counter Replacement is TRUE?

(more than one answers).

A)  Only Counter based measuring point can have counter replacement.
B)  Both Counter and Non-Counter based measuring point can have counter replacement.
C)  Measurement Document is used to register counter replacement.
D)  A replacement counter must be set to zero.
E)  It is possible to have a non zero entery when registering counter replacement.
.

Question no 2899 : Fleet Equipment Gas Station

In SAP PM/CS in ECC6.0 EhP6, which of the following are Gas Station used in Fleet Equipment Management ?

(Only  one answer)

A)  Gas Station is linked to Plant and Storage Location.
B)  Gas Station is linked to Functional Location.
C)  Gas Station is linked to Plant/Storage Location and Material.
D)  Gas Station is linked to Plant/Storage Location and Fuel Type.
E)  Gas Station is linked to Fuel Type.
.

Question no 2898 : Item Status in Material BOM

In SAP PM/CS as at ECC6.0 EhP6, which of the following determine the Item Status setting for a Material assign to the BOM ?

(only one answer)

A)   BOM Status.
B)   BOM category.
C)   Item Category.
D)   BOM Usage.
E)   System Status.
.

Question no 2897 : Serial number use in PM/CS

In SAP PM/CS ECC6.0 EhP6, Serial number in PM/CS can be applied the following manner.

(more than one answers)

A)   You can link material serial number to functional location and equipment master.
B)   You can link material serial number to equipment master.
C)   You can create material with serial number but not linked to any technical object.
D)   The serial number may not be necessary synchronized with the equipment number.
E)   When goods receipt material with serial, you can enter external alphanumeric ID for serial number.
.

Question no 2896 : Material Serial data in PM/CS technical object

In SAP PM/CS ECC6.0 EhP6, the Serial data tab in the Equipment master allows you to check which of the following stock information ?

(more than one answers)

A)   Special Stock.
B)   Valuation type.
C)   Stock type.
D)   Plant, Storage Location.
E)   Vendor.
.

Sales and Distribution - Customer Consignment Issue (Order type CI)

















Question no 2895 : IBAU material type

In SAP PM/CS as at ECC6.0 EhP6, when using material with 'IBAU' material type, what item category is valid when assign it as an assembly ? 

(more than one answers)

A)  L.
B)  N.
C)  I.
D)  D.
E)  T.
.

Sales and Distribution - Customer Consignment Fill-Up (Order type CF)
















Question no 2894 : PM/CS LAM

In SAP PM/CS as at ECC6.0, which of the following data structure for LAM (Linear Asset Management) provides the standard markers as reference points when defining technical objects specifying relationship of the technical object to the markers ?

(only one answer)

A)   Offsets.
B)   Linear Reference Pattern.
C)   Object Network.
D)   Network Attribute.
E)   Object Link Reference.
.

Question no 2893 : Linear Asset Data

In SAP PM/CS ECC6.0 EhP6, which of the following is provided in Linear Asset data to locate technical objects in the real world ?

(more than one answers)

A)   Offsets.
B)   Markers.
C)   Distances to Markers.
D)   Start and End Points.
E)   Longitude and Latitude.
.

Monday, March 30, 2015

Question no 2892 : Structural Indicator PM/CS

In SAP PM/CS as at ECC6.0 EhP6, the coding ID for numeric, character, and special character is represented by which of the following ?

(only one answer)

A)  A.
B)  N.
C)  S.
D)  C.
E)  X.
.

Question no 2891 : Status Profile in PM/CS

In SAP PM/CS as at ECC6.0 EhP6, which of the following statements correctly describes the characteristics od Status Profile ?

(more than one answers)

A)  You should not assign the same status profile to more than one object.
B)  Status profile are plant specific.
C)  Status profile are not organizational specific.
D)  Both statuses with status number and withour status number can co-exist within a status profile.
E)  Only either statuses of status number or w/o status no. can exist within a status profile.
.

Question no 2890 : View Profile in PM/CS

In SAP PM/CS as at ECC6.0 EhP6, definitive screen group choices when defining View Profile for technical Objects are while of the following ?

(more than one answers)

A)  Fleet object.
B)  Equipment.
C)  Functional Location.
D)  Customer Service.
E)  Production Resource Tools.
.

Question no 2889 : PM/CS Technical Object

In SAP PM/CS as at ECC6.0 EhP6, which of the following configuration are correct ?

(more than one answers)

A)   The same status profile can be assigned to both equipment category and functional category.
B)   The same object info key can be assigned to both equipment category and functional category.
C)   The same partner procedure can be assigned to both equipment category and functional category.
D)   The same priority profile can be assigned to both equipment category and functional category.
E)   The same view profile can be assigned to both equipment category and functional category.
.

Question no 2888 : Equipment-Asset Synchronization

In SAP PM/CS ECC6.0 EhP6, when setting up Equipment-Asset Synchronization, which of the the following are possible ?

(A)   Field-specific synchronization.
(B)   Synchronization when creating.
(C)   Synchronization when changing.
(D)   Asset class and Equipment category match-up for synchronization.
(E)   Synchronization from Equipment view point or Asset view point.
.

Question no 2887 : PM/CS Technical Object data inheritance

In SAP PM/CS as at ECC6.0 EhP6, which of the following data inheritance are applicable to Equipment ?

(more than one answers)

A)   Superior Equipment.
B)   Superior Functional Location.
C)   Reference Functional Location.
D)   Individual Maintenance.
E)   Mass Maintenance.
.

Question no 2886 : Product Structure Browser

In SAP PM/CS as at ECC6.0 EhP6, the 'Product Structure Browser' provides which of the following features ?

(more than one answers)

A)   Create Subordinate Functional Locations.
B)   Create Equipment.
C)   Install Equipment.
D)   Re-assign SubHierarchy.
E)   Copy SubHierarchy.

Question no 2885 : Technical Objects in PM/CS

In SAP PM/CS ECC6.0 EhP6, Technical Objects creation, which are TRUE ?

(more than one answers)

A)   Labeling System, Structural Indicator, and Functional Location Category are required when creating Functional Location and Reference Functional Location.
B)   Labeling System, Structural Indicator, and Functional Location Category are required when creating Functional Location.
C)   Only Functional Location Category are required when creating Reference Functional Location.
D)   Only Structural Indicator, and Functional Location Category are required when creating Reference Functional Location.
E)   Structural Indicator, and Functional Location Category are required when creating Functional Location and Reference Functional Location but Labeling System are always optional for both.
.

Sunday, March 29, 2015

Question no 2884 : Stock Determination for PM

In SAP PM ECC6.0 EhP6, setup for Stock Determination for storage location of stock items include which of the following ?

(more than one answers)

A)  Stock Determination Rule in the Material Master.
B)  Stock Determination Group in the Material Master.
C)  Stock Determination Rule assign to the Plant/Order Type.
D)  Stock Determination Group assign to thr Plant/Order Type.
E)  Stock Determination Strategy assign to the Plant/ Order Type.
.

Question no 2883 : Permits in Plant Maintenance

In SAP PM ECC6.0 EhP6, Permits allows you to control the following ?

(more than one answers)

A)  Release of the Maintenance Order.
B)  Technical Completion of the Maintenance Order.
C)  Business Cloaing of thr Maintenance Order.
D)  You can assign Permits either manually or automatically to the Maintenance Order.
E)  Both Technical and Process Permits are possible within a Maintenance Order.
.

Question no 2882 : Reservations in Maintenance Order

In SAP PM ECC6.0 EhP6, evaluate the following statements about Reservations generated from a Maintenance Order ?

(more than one answers)

A)  These reservations cannot be manipulated via manually changes in materials management.
B)  Only one reservation can be generated for each maintenance order.
C)  Reservations with or wihout final issue indicator will be set deletion flag when the maintenance order technical completion.
D)  Competion of Goods issue with referenced to the reservations must be adhered to before the maintenance order can be technically completed.
E)  Reservations are generated for both stock and non-stock material scenario.
.

Question no 2881 : Maintenance Plan

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following statements regarding Maintenance Plans are corrects ?

(more than one answers)

A)  A Maintenance Plan must have a minimum of one Maintenance Item.
B)  Task list assignment to the Maintenance Item is optional.
C)  Technical object assignment to a Maintenance Item is mandatory.
D)  If the Task list is assigned to the Header of the Maintenance Plan, it applies to all Maintenance Items.
E)  The Maintenance Plan header must be set to 'Release Status' before scheduling can take place.

Question no 2880 : Maintenance Strategy

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following Preventive Maintenance Plan scenario requires a Maintenance Strategy ?

(more than one answers)

A)   Single-Cycle, time-based.
B)   Time-based Strategy plan.
C)   Single-Cycle, performance-based.
D)   Performance-based Strategy plan.
E)   Multi-Counter plan.
.

Friday, March 27, 2015

Question no 2879 : Framework Purchase Order

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following Preventive Scenario uses Framework Purchase Order ?

(only one answer)

A)  Single-Cycle Maintenance Plan.
B)  Performance-Based Maintenance Plan.
C)  Multi-Counter Plan.
D)  Service Procurement Plan.
E)  Calibration Plan.
.

Question no 2878 : Goods Receipt of Non-Stock Purchase Order

In SAP PM ECC6.0 EhP6, Goods Receipt of Non-Stock Purchase Order is not possible in which system status of the Maintenance Order ?

(more than one answers)

A)   CRTD.
B)   REL.
C)   TECO.
D)   CLSD.
E)   LKD.
.

Question no 2877 : Maintenance Order Business Closing

In SAP PM ECC6.0 EhP6, when reversal from Business Closing for a Maintenance Order, which of the following are correct ?

(more than one answers)

A)  You can now perform receiving of non-stock Purchase Orders.
B)  Invoice entry of non-stock Purchase Order can now takes place.
C)  Purchase Requisition now re-open from deletion flag for further processing.
D)  Settlement parameters are re-determined.
E)  Settlement rule can be changed.
.

Question no 2876 : Maintenance Order Technical Completion

In SAP PM ECC6.0 EhP6, Maintenance Order at 'TECO' status, ___________________ .

(more than one answers)

A)   The Settlement Rule cannot be changed.
B)   The linked Notification cannot be 'Put in Process' again unless Maintenance Order is reversed from TECO.
C)   Overhead Calculation can proceed.
D)   Balance costs in Maintenance Order after 'TECO', then Business Closing is Possible.
E)   Goods receipt for non-stock purchase order is not longer possible.
.

Question no 2875 : Maintenance Order Settlement

In SAP Plant Maintenance as at ECC6.0 EhP6, which of the following are per-requisites for Maintenance Order Settlement ? 

(only one answer)

A)  Order must be Released.
B)  Order must have 'TECO' status.
C)  All Goods Issues are completed.
D)  All Operations Confirmation must have been done.
E)  All Purchase Requisitions must have been converted to Purchase Orders.
.

MM-CO Integration: Purchase Order with I/O Account Assignment and Final Settlement from I/O to Cost Center