PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts
Valuation type is an integral part of the refurbishment process master data definition, valuation type provides the following setup features ?
(more than one answers)
(A) Allows different price controls for each valuation type.
(B) Allows different prices for each valuation type regardless of its price control.
(C) Allows different prices for each valuation type as long as the price control is different.
(D) Allows control of posting to separate G/L accounts.
(E) Allows different movement types for each valuation type.
.
This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
Sunday, October 31, 2010
Question no : 635 PM Order Refurbishment Concept
PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts
What are the steps in the refurbishment process ?
(more than one answers)
(A) Create a special refurbishment order with a “from” and “to” status of the valuation types.
(B) Withdraw the defective material from the warehouse with a goods issue.
(C) Return the repaired material by reversing the goods issue.
(D) Define a settlement profile with material as the default account assignment.
(E) Create a internal stock transfer order to transfer the stocks from the PM system to the MM system.
.
Unit 06 Refurbishment of Spare Parts
What are the steps in the refurbishment process ?
(more than one answers)
(A) Create a special refurbishment order with a “from” and “to” status of the valuation types.
(B) Withdraw the defective material from the warehouse with a goods issue.
(C) Return the repaired material by reversing the goods issue.
(D) Define a settlement profile with material as the default account assignment.
(E) Create a internal stock transfer order to transfer the stocks from the PM system to the MM system.
.
Question no : 634 PM Order Corrective Scenario Concept
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following is true about the Object List in the Maintenance order ?
(more than one answers)
(A) You can assign a mixture of technical objects in a single maintenance order.
(B) You can assign only one type of technical objects in a single maintenance order.
(C) You can create an individual notification for each technical object in the object list.
(D) You can assign or define any of the notification in the object list in the maintenance order as the notification header.
(E) When the maintenance order header already has a notification as the notification header, it cannot be re-assigned with other notifications in the object list of the maintenance order.
.
Unit 05 Corrective Maintenance
Which of the following is true about the Object List in the Maintenance order ?
(more than one answers)
(A) You can assign a mixture of technical objects in a single maintenance order.
(B) You can assign only one type of technical objects in a single maintenance order.
(C) You can create an individual notification for each technical object in the object list.
(D) You can assign or define any of the notification in the object list in the maintenance order as the notification header.
(E) When the maintenance order header already has a notification as the notification header, it cannot be re-assigned with other notifications in the object list of the maintenance order.
.
Saturday, October 30, 2010
Question no : 633 PM Order Cancel confirmation
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
When you “Cancell” a confirmation:
(more than one answers)
(A) You can partially cancel the confirmation results.
(B) The entire confirmation result is cancelled.
(C) The status at the operation level is reversed.
(D) You are asked to key in a canceling reason.
(E) A new confirmation number is generated.
.
Unit 05 Corrective Maintenance
When you “Cancell” a confirmation:
(more than one answers)
(A) You can partially cancel the confirmation results.
(B) The entire confirmation result is cancelled.
(C) The status at the operation level is reversed.
(D) You are asked to key in a canceling reason.
(E) A new confirmation number is generated.
.
Question no : 632 PM Execution AV Check
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Material availability check requires which of the following setup ?
(only one answer)
(A) Material master AV check group and Order type AV check rule.
(B) Material master AV check rule Order type AV check group.
(C) Material master AV check rule and Order Category AV check rule.
(D) Material master AV check group and Order Category AV check rule.
(E) Material master AV check rule and Order Category AV check group.
.
Unit 05 Corrective Maintenance
Material availability check requires which of the following setup ?
(only one answer)
(A) Material master AV check group and Order type AV check rule.
(B) Material master AV check rule Order type AV check group.
(C) Material master AV check rule and Order Category AV check rule.
(D) Material master AV check group and Order Category AV check rule.
(E) Material master AV check rule and Order Category AV check group.
.
Question no : 631 PM Order Costing Value Category
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Costing results shown as value category in the maintenance order are:
(only one answer)
(A) Grouping of costs based on value categories.
(B) Grouping of costs from a group of cost centers assigned to the various object types in the maintenance order.
(C) Grouping of costs based on material type of components and control key of operations.
(D) Grouping of costs based on object type in the maintenance order.
(E) Grouping of costs from a group of costs elements.
.
Unit 05 Corrective Maintenance
Costing results shown as value category in the maintenance order are:
(only one answer)
(A) Grouping of costs based on value categories.
(B) Grouping of costs from a group of cost centers assigned to the various object types in the maintenance order.
(C) Grouping of costs based on material type of components and control key of operations.
(D) Grouping of costs based on object type in the maintenance order.
(E) Grouping of costs from a group of costs elements.
.
Friday, October 29, 2010
Question no : 630 PM Execution Central Address Management
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Central Address Management’s address records can be accessed and copied into:
(only one answer)
(A) Order Header specific address.
(B) Partners specific address.
(C) "PM01" Control Key Operations specific address.
(D) Certain Components specific address.
(E) All Technical Objects specific address. in the Objects list.
.
Unit 05 Corrective Maintenance
Central Address Management’s address records can be accessed and copied into:
(only one answer)
(A) Order Header specific address.
(B) Partners specific address.
(C) "PM01" Control Key Operations specific address.
(D) Certain Components specific address.
(E) All Technical Objects specific address. in the Objects list.
.
Question no : 629 PM Execution Document Flow
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Document Flow List provides the following information on a maintenance order:
(more than one answers)
(A) Confirmation results.
(B) Unplanned goods issue results.
(C) Planned goods issue results.
(D) Status of Operations.
(E) Status of Order.
.
Unit 05 Corrective Maintenance
Document Flow List provides the following information on a maintenance order:
(more than one answers)
(A) Confirmation results.
(B) Unplanned goods issue results.
(C) Planned goods issue results.
(D) Status of Operations.
(E) Status of Order.
.
Question no : 628 PM Execution Order Delta Printing
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
A Delta print will:
(only one answer)
(A) Print all shop papers not yet printed for a maintenance order.
(B) Print operations and components in separate shop papers.
(C) Print each operations in the maintenance order separately.
(D) Print components not yet withdraw from stock.
(E) Print remaining operations which is not confirmed yet.
.
Unit 05 Corrective Maintenance
A Delta print will:
(only one answer)
(A) Print all shop papers not yet printed for a maintenance order.
(B) Print operations and components in separate shop papers.
(C) Print each operations in the maintenance order separately.
(D) Print components not yet withdraw from stock.
(E) Print remaining operations which is not confirmed yet.
.
Thursday, October 28, 2010
Question no : 627 PM Execution Order Release Functions
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
You are able to release maintenance orders via which of the following methods ?
(more than one answers)
(A) Within the maintenance order.
(B) Operation List.
(C) Order and Operation List.
(D) Order List.
(E) Material Where-used list.
.
Unit 05 Corrective Maintenance
You are able to release maintenance orders via which of the following methods ?
(more than one answers)
(A) Within the maintenance order.
(B) Operation List.
(C) Order and Operation List.
(D) Order List.
(E) Material Where-used list.
.
Question no : 626 PM Execution Order Confirmation Functions
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following List Display reports allow you to confirm operations ?
(only one answer)
(A) Order and Operation List.
(B) Operation List.
(C) Component List.
(D) Order List.
(E) Order and Operation List.
.
Unit 05 Corrective Maintenance
Which of the following List Display reports allow you to confirm operations ?
(only one answer)
(A) Order and Operation List.
(B) Operation List.
(C) Component List.
(D) Order List.
(E) Order and Operation List.
.
Wednesday, October 27, 2010
Question no : 625 PM Execution Order Planned/Unplanned GI
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following report best describes planned and unplanned goods issue for the maintenance order ?
(only one answer)
(A) Order Flow.
(B) Order List Multi-level.
(C) Component List.
(D) Material Where-used list.
(E) Time ticket Confirmation.
.
Unit 05 Corrective Maintenance
Which of the following report best describes planned and unplanned goods issue for the maintenance order ?
(only one answer)
(A) Order Flow.
(B) Order List Multi-level.
(C) Component List.
(D) Material Where-used list.
(E) Time ticket Confirmation.
.
Question no : 624 PM Execution Order External Service Work Center
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following are characteristics of external services procurement scenario using work center to represent the external company ?
(more than one answers)
(A) A Blanket Purchase Order is to be created with validity dates.
(B) The cost center must have been assigned to the blanket PO.
(C) The costs of the services are recorded in the activity prices.
(D) Shop papers from maintenance order are send to the external company.
(E) Periodic invoicing will debit the cost center.
.
Unit 05 Corrective Maintenance
Which of the following are characteristics of external services procurement scenario using work center to represent the external company ?
(more than one answers)
(A) A Blanket Purchase Order is to be created with validity dates.
(B) The cost center must have been assigned to the blanket PO.
(C) The costs of the services are recorded in the activity prices.
(D) Shop papers from maintenance order are send to the external company.
(E) Periodic invoicing will debit the cost center.
.
Question no : 623 PM Execution Order External Service Concepts
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which method is used to record services completed by external services procurement scenario via service specifications ?
(only one answer)
(A) Confirmations.
(B) Service entry sheets.
(C) Goods receipt.
(D) Service confirmations.
(E) Collective invoice verifications.
.
Unit 05 Corrective Maintenance
Which method is used to record services completed by external services procurement scenario via service specifications ?
(only one answer)
(A) Confirmations.
(B) Service entry sheets.
(C) Goods receipt.
(D) Service confirmations.
(E) Collective invoice verifications.
.
Tuesday, October 26, 2010
Question no : 622 PM Execution Order Control Key PM03
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Control key PM03 supports which type of Procurement scenario ?
(only one answer)
(A) External procurement for stocks item.
(B) External procurement for non-stock item.
(C) External services procurement for external company as work center.
(D) External services procurement for individual purchase order.
(E) External services procurement for service items/specifications.
.
Unit 05 Corrective Maintenance
Control key PM03 supports which type of Procurement scenario ?
(only one answer)
(A) External procurement for stocks item.
(B) External procurement for non-stock item.
(C) External services procurement for external company as work center.
(D) External services procurement for individual purchase order.
(E) External services procurement for service items/specifications.
.
Question no : 621 PM Execution Change Histories
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following object displays in chronological order any changes made to the notifications, orders, equipments, and functional locations.
(only one answer)
(A) Action log.
(B) Change log.
(C) Object list.
(D) Active list.
(E) Activity log.
.
Unit 05 Corrective Maintenance
Which of the following object displays in chronological order any changes made to the notifications, orders, equipments, and functional locations.
(only one answer)
(A) Action log.
(B) Change log.
(C) Object list.
(D) Active list.
(E) Activity log.
.
Question no : 620 PM Execution Confirmation Process
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following statements are True regarding the confirmation process ?
(more than one answers)
(A) For Order confirmation to complete the order and notification together, there must not be any outstanding tasks in the notification.
(B) Technically complete (TECO) status cannot be reversed.
(C) At TECO status, all open purchase requisitions are closed.
(D) Technically complete cannot be set if there are open purchase requisitions and open reservations.
(E) Technically complete can be set even if there are open purchase requisitions and open reservations.
.
Unit 05 Corrective Maintenance
Which of the following statements are True regarding the confirmation process ?
(more than one answers)
(A) For Order confirmation to complete the order and notification together, there must not be any outstanding tasks in the notification.
(B) Technically complete (TECO) status cannot be reversed.
(C) At TECO status, all open purchase requisitions are closed.
(D) Technically complete cannot be set if there are open purchase requisitions and open reservations.
(E) Technically complete can be set even if there are open purchase requisitions and open reservations.
.
Monday, October 25, 2010
Question no : 619 PM Execution Confirmation
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
During the confirmation process, the following are possible:
(more than one answers)
(A) Actual maintenance time used is entered.
(B) Technical findings such as damage, case of damage, or repairs performed.
(C) Perform material withdrawal.
(D) Perform material backflush.
(E) Record who has performed the maintenance operation.
.
Unit 05 Corrective Maintenance
During the confirmation process, the following are possible:
(more than one answers)
(A) Actual maintenance time used is entered.
(B) Technical findings such as damage, case of damage, or repairs performed.
(C) Perform material withdrawal.
(D) Perform material backflush.
(E) Record who has performed the maintenance operation.
.
Question no : 618 PM Execution Order Status "Business Completion"
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Setting the Maintenance order with status “Business Completion” generally means the following:
(more than one answers)
(A) All costs have already been posted.
(B) The Maintenance order has been archived.
(C) The order has been settled by Controlling.
(D) Further time confirmations are not allowed.
(E) Maintenance order is now in display mode only.
.
Unit 05 Corrective Maintenance
Setting the Maintenance order with status “Business Completion” generally means the following:
(more than one answers)
(A) All costs have already been posted.
(B) The Maintenance order has been archived.
(C) The order has been settled by Controlling.
(D) Further time confirmations are not allowed.
(E) Maintenance order is now in display mode only.
.
Question no : 617 PM Execution Order Shop Paper setups
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following Shop Papers printing depends on the Control Key assigned to the operation in the maintenance order ?
(more than one answers)
(A) Material withdrawal slip.
(B) Job Ticket.
(C) Control Ticket.
(D) Confirmation Slip.
(E) Time Ticket.
.
Unit 05 Corrective Maintenance
Which of the following Shop Papers printing depends on the Control Key assigned to the operation in the maintenance order ?
(more than one answers)
(A) Material withdrawal slip.
(B) Job Ticket.
(C) Control Ticket.
(D) Confirmation Slip.
(E) Time Ticket.
.
Sunday, October 24, 2010
Question no : 616 PM Execution Order Shop Paper features
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following Shop Papers provides the employee responsible in Plant Maintenance with a complete overview of the order. It also contains details of permits ?
(only one answer)
(A) Operation List.
(B) Time ticket.
(C) Operation control ticket.
(D) Job ticket.
(E) Control ticket.
.
Unit 05 Corrective Maintenance
Which of the following Shop Papers provides the employee responsible in Plant Maintenance with a complete overview of the order. It also contains details of permits ?
(only one answer)
(A) Operation List.
(B) Time ticket.
(C) Operation control ticket.
(D) Job ticket.
(E) Control ticket.
.
Question no : 615 PM Execution Order Costing Analysis
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
When analyzing Maintenance order costing; cost analysis can be displayed using cost element and value category, what is the relationship of these 2 types of cost analysis report ?
(more than one answers)
(A) Groups of cost elements are used to specify or assigned to the value categories.
(B) Value category analysis is a summary report while Cost element report is a more detail report.
(C) Value category analysis is accessible in PM while Cost element report analysis is accessible in CO.
(D) Groups of value categories are used to specify or assigned to the cost element.
(E) Cost Element analysis report contains the Actual costs posted to the maintenance order while Value category analysis report will show both the planned and actual costs posted to the maintenance order.
.
Unit 05 Corrective Maintenance
When analyzing Maintenance order costing; cost analysis can be displayed using cost element and value category, what is the relationship of these 2 types of cost analysis report ?
(more than one answers)
(A) Groups of cost elements are used to specify or assigned to the value categories.
(B) Value category analysis is a summary report while Cost element report is a more detail report.
(C) Value category analysis is accessible in PM while Cost element report analysis is accessible in CO.
(D) Groups of value categories are used to specify or assigned to the cost element.
(E) Cost Element analysis report contains the Actual costs posted to the maintenance order while Value category analysis report will show both the planned and actual costs posted to the maintenance order.
.
Question no : 614 PM Execution Order Central Address Management
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Central address management can be connected to which of the following objects:
(more than one answers)
(A) Equipment.
(B) Functional Location.
(C) Maintenance Notification.
(D) Component for non-stock materials in the Maintenance Order.
(E) Maintenance Order.
.
Unit 05 Corrective Maintenance
Central address management can be connected to which of the following objects:
(more than one answers)
(A) Equipment.
(B) Functional Location.
(C) Maintenance Notification.
(D) Component for non-stock materials in the Maintenance Order.
(E) Maintenance Order.
.
Question no : 613 PM Execution Order Web Catalog
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
When Catalog are access through the EBP (Enterprise Buyer Professional) for material planning in the maintenance order; the following are the pre-requisites required:
(more than one answers)
(A) EBP system customizing must be setup in the R/3 back-end system.
(B) Maintenance order is first created in the R/3 system and accessed by the EBP system for procurement planning.
(C) An External or Internal catalog must be available to the EBP system.
(D) The component selected for procurement through EBP can either be a non-stock item or a stock item.
(E) The Maintenance order is created in the EBP system, procurement planning completed through external catalogs and the saved maintenance order is transferred to the R/3 system.
.
Unit 05 Corrective Maintenance
When Catalog are access through the EBP (Enterprise Buyer Professional) for material planning in the maintenance order; the following are the pre-requisites required:
(more than one answers)
(A) EBP system customizing must be setup in the R/3 back-end system.
(B) Maintenance order is first created in the R/3 system and accessed by the EBP system for procurement planning.
(C) An External or Internal catalog must be available to the EBP system.
(D) The component selected for procurement through EBP can either be a non-stock item or a stock item.
(E) The Maintenance order is created in the EBP system, procurement planning completed through external catalogs and the saved maintenance order is transferred to the R/3 system.
.
Saturday, October 23, 2010
Question no : 612 PM Execution Order Non-Stock Scenarios
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
When a non-stock material is created in the maintenance order, which of the statements do not correctly depict its functionality :
(more than one answers)
(A) A purchase requisition is always automatically generated.
(B) A purchase order can be created manually in the maintenance order.
(C) Goods receipt can only be entered with reference to the purchase order after the order has been put in process.
(D) Goods receipt can be entered with reference to the purchase order before or after the order has been put in process.
(E) Invoice verification of the purchase order will never affect the costs of the original purchase order value posted as it is integrated from materials management to accounts payable.
.
Unit 05 Corrective Maintenance
When a non-stock material is created in the maintenance order, which of the statements do not correctly depict its functionality :
(more than one answers)
(A) A purchase requisition is always automatically generated.
(B) A purchase order can be created manually in the maintenance order.
(C) Goods receipt can only be entered with reference to the purchase order after the order has been put in process.
(D) Goods receipt can be entered with reference to the purchase order before or after the order has been put in process.
(E) Invoice verification of the purchase order will never affect the costs of the original purchase order value posted as it is integrated from materials management to accounts payable.
.
Question no : 610 PM Execution Order Object List
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
The Object List is an integral part of the maintenance order, which of the following statements are correct about the Object List.
(more than one answers)
(A) The objects you that you may enter in the Object List must have been entered in the maintenance header data screen.
(B) A maintenance order may have only one notification assigned in the Object List BUT multiple equipments are possible in the Object List.
(C) The types of objects you may enter in the Object List does depends on the choice of reference object for the maintenance order.
(D) The Object List “controls” the order in that work done is distributed amongst the objects assigned as well as fair distribution of costs between the objects.
(E) Notifications already assigned in the Object Lists can be separated or dis-located from the maintenance order.
.
Unit 05 Corrective Maintenance
The Object List is an integral part of the maintenance order, which of the following statements are correct about the Object List.
(more than one answers)
(A) The objects you that you may enter in the Object List must have been entered in the maintenance header data screen.
(B) A maintenance order may have only one notification assigned in the Object List BUT multiple equipments are possible in the Object List.
(C) The types of objects you may enter in the Object List does depends on the choice of reference object for the maintenance order.
(D) The Object List “controls” the order in that work done is distributed amongst the objects assigned as well as fair distribution of costs between the objects.
(E) Notifications already assigned in the Object Lists can be separated or dis-located from the maintenance order.
.
Question no : 609 PM Execution Order Fast Entry
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
For a fast entry of a simple corrective maintenance order with a single operation, which of the following data entry choice is best suited.
(only one answer)
(A) You can enter the operation data in the header data screen and confirm the single operation in the operation overview screen.
(B) You can enter the operation data in the header data screen and proceed to the operational detail screen to enter the Control Key before saving.
(C) You can enter the operation data in the header data screen without having to use any further screens.
(D) You must enter the operation data in the operation overview screen without having to use any further screens.
(E) You can enter the operation data in the reference object view in the initial maintenance order screen to default to the operation overview screen to save a data entry step.
.
Unit 05 Corrective Maintenance
For a fast entry of a simple corrective maintenance order with a single operation, which of the following data entry choice is best suited.
(only one answer)
(A) You can enter the operation data in the header data screen and confirm the single operation in the operation overview screen.
(B) You can enter the operation data in the header data screen and proceed to the operational detail screen to enter the Control Key before saving.
(C) You can enter the operation data in the header data screen without having to use any further screens.
(D) You must enter the operation data in the operation overview screen without having to use any further screens.
(E) You can enter the operation data in the reference object view in the initial maintenance order screen to default to the operation overview screen to save a data entry step.
.
Question no : 608 PM Execution Order Release
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
When the maintenance order is released:
(more than one answers)
(A) Material reservations are created.
(B) Material withdrawal is now allowed.
(C) Material availability check may be automatically performed by the system.
(D) Additional materials cannot be inserted to the maintenance order.
(E) Materials other than specified in the maintenance order cannot be withdraw for the maintenance order.
.
Unit 05 Corrective Maintenance
When the maintenance order is released:
(more than one answers)
(A) Material reservations are created.
(B) Material withdrawal is now allowed.
(C) Material availability check may be automatically performed by the system.
(D) Additional materials cannot be inserted to the maintenance order.
(E) Materials other than specified in the maintenance order cannot be withdraw for the maintenance order.
.
Friday, October 22, 2010
Question no : 607 PM Execution Order Reference Object View
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
The reference object view in the initial screen for creating a maintenance order, in the standard system; the following view versions are available:
(more than one answers)
(A) Function location, equipment and assembly.
(B) Material number and serial number.
(C) Equipment.
(D) Without reference object.
(E) Task List
..
Unit 05 Corrective Maintenance
The reference object view in the initial screen for creating a maintenance order, in the standard system; the following view versions are available:
(more than one answers)
(A) Function location, equipment and assembly.
(B) Material number and serial number.
(C) Equipment.
(D) Without reference object.
(E) Task List
..
Question no : 606 PM Execution Order Scenario
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following Maintenance Order Scenario is supported by SAP Plant Maintenance ?
(more than one answers)
(A) A responsible planner detects damage of a piece of equipment personally. The planner creates the order required for repair work and simultaneously also creates a notification for the order.
(B) An aircraft needs to be repaired. It is assigned to planning plant 1000 in its master records. However, the aircraft has to be repaired in plant 1200. The planner can therefore enter the deviating planning plant 1200 in the maintenance order for the aircraft.
(C) Environmental protection and manufacturer regulations require that a production plant is maintained at regular intervals. Therefore, the responsible planner creates a maintenance plan, which contains the required work in the form of a task list. Based on the maintenance schedule defined, the system now automatically can generates an order for preventive maintenance of the production plant at regular intervals.
(D) The responsible planner checks the newly created notifications outstanding in the system. A maintenance task must be planned and performed immediately for one of the notifications. The planner therefore creates an order directly from the notification selected in the change mode.
(E) An employee discovers some damage of a piece of equipment when a planner is present. The planner does not enter a malfunction report in the system. But instead immediately creates an order to plan the repair.
Which of the following Maintenance Order Scenario is supported by SAP Plant Maintenance ?
(more than one answers)
(A) A responsible planner detects damage of a piece of equipment personally. The planner creates the order required for repair work and simultaneously also creates a notification for the order.
(B) An aircraft needs to be repaired. It is assigned to planning plant 1000 in its master records. However, the aircraft has to be repaired in plant 1200. The planner can therefore enter the deviating planning plant 1200 in the maintenance order for the aircraft.
(C) Environmental protection and manufacturer regulations require that a production plant is maintained at regular intervals. Therefore, the responsible planner creates a maintenance plan, which contains the required work in the form of a task list. Based on the maintenance schedule defined, the system now automatically can generates an order for preventive maintenance of the production plant at regular intervals.
(D) The responsible planner checks the newly created notifications outstanding in the system. A maintenance task must be planned and performed immediately for one of the notifications. The planner therefore creates an order directly from the notification selected in the change mode.
(E) An employee discovers some damage of a piece of equipment when a planner is present. The planner does not enter a malfunction report in the system. But instead immediately creates an order to plan the repair.
.
Question no : 605 PM Execution Order Auto Generate
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which of the following functions automatically generates a maintenance order ?
(only one answer)
(A) Notification.
(B) Maintenance Plan.
(C) Maintenance Task List.
(D) Reburbishment Plan.
(E) Activity Report.
.
Unit 05 Corrective Maintenance
Which of the following functions automatically generates a maintenance order ?
(only one answer)
(A) Notification.
(B) Maintenance Plan.
(C) Maintenance Task List.
(D) Reburbishment Plan.
(E) Activity Report.
.
Thursday, October 21, 2010
Question no : 603 PM Execution Order Costing Concept
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Information regard which CO object should bear the maintenance costs is stored in which data element in the Maintenance Order ?
(only one answer)
(A) Cost segment.
(B) Profitability segment.
(C) Object List.
(D) Cost center.
(E) Settlement rule.
.
Unit 05 Corrective Maintenance
Information regard which CO object should bear the maintenance costs is stored in which data element in the Maintenance Order ?
(only one answer)
(A) Cost segment.
(B) Profitability segment.
(C) Object List.
(D) Cost center.
(E) Settlement rule.
.
Question no : 604 PM Execution Order External Processing
As of ECC6.0
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which are the 3 ways of representing external processing in the Maintenance order ?
(more than one answers)
(A) Processing with an external company as work center.
(B) Processing with MM Purchase Order processing and goods receipt.
(C) Processing with service specifications.
(D) Processing with an external production order.
(E) Processing with service orders.
.
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Which are the 3 ways of representing external processing in the Maintenance order ?
(more than one answers)
(A) Processing with an external company as work center.
(B) Processing with MM Purchase Order processing and goods receipt.
(C) Processing with service specifications.
(D) Processing with an external production order.
(E) Processing with service orders.
.
Question no : 602 PM Execution Order Object Services
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
Object service is a function that:
(more than one answers)
(A) Enables you to send a mail to any SAP user or distribution list.
(B) Enables the user to branch directly to the relevant transaction.
(C) Enables automatic response to mails sent using this function.
(D) Is only available for technical objects, notifications, and orders.
(E) Is available for technical objects, notifications, orders, task list, maintenance plans, and work centers.
.
Unit 05 Corrective Maintenance
Object service is a function that:
(more than one answers)
(A) Enables you to send a mail to any SAP user or distribution list.
(B) Enables the user to branch directly to the relevant transaction.
(C) Enables automatic response to mails sent using this function.
(D) Is only available for technical objects, notifications, and orders.
(E) Is available for technical objects, notifications, orders, task list, maintenance plans, and work centers.
.
Question no : 595 PM Execution Order Concepts
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
The Decisions of type of work to be performed and resources/tools required are usually carried out in which step of the Corrective Maintenance Process ?
(only one answer)
(A) Notification.
(B) Planning.
(C) Scheduling.
(D) Execution.
(E) Completion.
.
Unit 05 Corrective Maintenance
The Decisions of type of work to be performed and resources/tools required are usually carried out in which step of the Corrective Maintenance Process ?
(only one answer)
(A) Notification.
(B) Planning.
(C) Scheduling.
(D) Execution.
(E) Completion.
.
Question no : 594 PM Execution Order Put in Process
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
A maintenance order can be put in process, which of the following are the results of this processing step ?
(more than one answers)
(A) The maintenance order shop papers are not printed automatically.
(B) The maintenance order shop papers are printed automatically.
(C) The maintenance order is released.
(D) The maintenance order is costed and saved.
(E) The maintenance order is settled.
.
Unit 04 Breakdown Maintenance
A maintenance order can be put in process, which of the following are the results of this processing step ?
(more than one answers)
(A) The maintenance order shop papers are not printed automatically.
(B) The maintenance order shop papers are printed automatically.
(C) The maintenance order is released.
(D) The maintenance order is costed and saved.
(E) The maintenance order is settled.
.
Question no : 593 PM Execution Order TECO
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
At technical complete of the maintenance order, which data is transferred from the maintenance order to the notification ?
(only one answer)
(A) Malfunction start date.
(B) Malfunction end date.
(C) Cause code.
(D) Damage code.
(E) Activities.
.
Unit 04 Breakdown Maintenance
At technical complete of the maintenance order, which data is transferred from the maintenance order to the notification ?
(only one answer)
(A) Malfunction start date.
(B) Malfunction end date.
(C) Cause code.
(D) Damage code.
(E) Activities.
.
Wednesday, October 20, 2010
Question no : 601 PM Execution Order Reporting
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
The List editing function has been converted to ABAP list viewer. This means that.
(more than one answers)
(A) You can shift columns.
(B) You can insert new headings into lists.
(C) You can sort by several fields simultaneously.
(D) You can combine several notifications and orders into a single list.
(E) You can display drawings in the lists.
Unit 05 Corrective Maintenance
The List editing function has been converted to ABAP list viewer. This means that.
(more than one answers)
(A) You can shift columns.
(B) You can insert new headings into lists.
(C) You can sort by several fields simultaneously.
(D) You can combine several notifications and orders into a single list.
(E) You can display drawings in the lists.
Question no : 600 PM Execution Notification Catalog Profile
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance
What is the purpose of the catalog profile used for notification ?
(more than one answers)
(A) So that only codes in the code groups relevant for the object are displayed for selection.
(B) So that all codes within a catalog assigned to the catalog profile are displayed for selection.
(C) So that the relevant codes selected can be used as a starting point for workflows and its follow up actions.
(D) So that recoded codes can be analyzed in the standard analysis within the PMIS.
(E) So that documents from the DMS (Document management system) can be assigned to the tasks, activities, and causes for documenting the malfunction history.
.
Unit 05 Corrective Maintenance
What is the purpose of the catalog profile used for notification ?
(more than one answers)
(A) So that only codes in the code groups relevant for the object are displayed for selection.
(B) So that all codes within a catalog assigned to the catalog profile are displayed for selection.
(C) So that the relevant codes selected can be used as a starting point for workflows and its follow up actions.
(D) So that recoded codes can be analyzed in the standard analysis within the PMIS.
(E) So that documents from the DMS (Document management system) can be assigned to the tasks, activities, and causes for documenting the malfunction history.
.
Question no : 592 PM Execution Order Breakdown Concepts
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
In General, the minimum data requirement for the maintenance order creation is:
(more than one answers)
(A) Maintenance order type.
(B) A technical object.
(C) Priority.
(D) Short text.
(E) Spare parts.
.
Unit 04 Breakdown Maintenance
In General, the minimum data requirement for the maintenance order creation is:
(more than one answers)
(A) Maintenance order type.
(B) A technical object.
(C) Priority.
(D) Short text.
(E) Spare parts.
.
Question no : 591 PM Execution Order Breakdown Processing Options
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Which of the following processing options are possible the for Breakdown Maintenance scenario ?
(more than one answers)
(A) Completing the notification while technically completing the maintenance order.
(B) Completing the notification separately from the technical completion of the maintenance order.
(C) Partially confirmation of the notification.
(D) Partially confirmation of the maintenance order.
(E) Partially confirmation of the maintenance order’s operations.
.
Unit 04 Breakdown Maintenance
Which of the following processing options are possible the for Breakdown Maintenance scenario ?
(more than one answers)
(A) Completing the notification while technically completing the maintenance order.
(B) Completing the notification separately from the technical completion of the maintenance order.
(C) Partially confirmation of the notification.
(D) Partially confirmation of the maintenance order.
(E) Partially confirmation of the maintenance order’s operations.
.
Question no : 590 PM Execution Order Confirmation Options
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Which confirmation options are available for Breakdown maintenance execution and completion ?
(more than one answers)
(A) Individual entry.
(B) Collective entry.
(C) Collective entry using operation list.
(D) Overall completion confirmation.
(E) Progress confirmation.
.
Unit 04 Breakdown Maintenance
Which confirmation options are available for Breakdown maintenance execution and completion ?
(more than one answers)
(A) Individual entry.
(B) Collective entry.
(C) Collective entry using operation list.
(D) Overall completion confirmation.
(E) Progress confirmation.
.
Tuesday, October 19, 2010
Question no : 589 PM Execution Order Partial Confirmation
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Partial confirmation with the status “PCNF” status in Time Confirmation option allows which of the following process ?
(more than one answers)
(A) Partial Confirmation done can be partially reversed.
(B) Partial Confirmation done must be reversed in full.
(C) Full Confirmation “CNF” can be done in the following confirmation step.
(D) Additional costs can be posted but the account assignment data is fixed.
(E) Account assignment data is changeable but additional costs cannot be posted.
.
Unit 04 Breakdown Maintenance
Partial confirmation with the status “PCNF” status in Time Confirmation option allows which of the following process ?
(more than one answers)
(A) Partial Confirmation done can be partially reversed.
(B) Partial Confirmation done must be reversed in full.
(C) Full Confirmation “CNF” can be done in the following confirmation step.
(D) Additional costs can be posted but the account assignment data is fixed.
(E) Account assignment data is changeable but additional costs cannot be posted.
.
Question no : 588 PM Execution Order TECO
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Technical completion of the maintenance order has the following effect ?
(more than one answers)
(A) Only certain fields in the maintenance order can now be changed.
(B) The “TECO” technically complete status can be revoked.
(C) Additional costs cannot be posted.
(D) Additional costs can be posted but the account assignment data is fixed.
(E) Allow immediate archiving and deletion of the maintenance order.
.
Unit 04 Breakdown Maintenance
Technical completion of the maintenance order has the following effect ?
(more than one answers)
(A) Only certain fields in the maintenance order can now be changed.
(B) The “TECO” technically complete status can be revoked.
(C) Additional costs cannot be posted.
(D) Additional costs can be posted but the account assignment data is fixed.
(E) Allow immediate archiving and deletion of the maintenance order.
.
Question no : 587 PM Execution Order Overall Confirmation
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Overall confirmations can be used to process which of the following processes ?
(more than one answers)
(A) Goods issue.
(B) Counter readings.
(C) Causes and activities for the notification order.
(D) Measurement readings.
(E) Time data.
.
Unit 04 Breakdown Maintenance
Overall confirmations can be used to process which of the following processes ?
(more than one answers)
(A) Goods issue.
(B) Counter readings.
(C) Causes and activities for the notification order.
(D) Measurement readings.
(E) Time data.
.
Question no : 586 PM Execution Breakdown Scenario
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
As a breakdown maintenance order can be created with or without a notification OR a notification is created with an a breakdown maintenance order. Which data element controls or provides these possibilities ?
(only one answer)
(A) Selection function in the Maintenance order initial screen.
(B) Maintenance order and Notification order link.
(C) Notification order type.
(D) Maintenance order scenario.
(E) Maintenance order type.
.
Unit 04 Breakdown Maintenance
As a breakdown maintenance order can be created with or without a notification OR a notification is created with an a breakdown maintenance order. Which data element controls or provides these possibilities ?
(only one answer)
(A) Selection function in the Maintenance order initial screen.
(B) Maintenance order and Notification order link.
(C) Notification order type.
(D) Maintenance order scenario.
(E) Maintenance order type.
.
Monday, October 18, 2010
Question no : 585 PM Execution Order Release
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
What activities are possible after a maintenance order has been released ?
(more than one answers)
(A) Material issue.
(B) Enter time confirmations.
(C) Post goods receipts.
(D) Completing a tasks.
(E) Printing shop papers.
.
Unit 04 Breakdown Maintenance
What activities are possible after a maintenance order has been released ?
(more than one answers)
(A) Material issue.
(B) Enter time confirmations.
(C) Post goods receipts.
(D) Completing a tasks.
(E) Printing shop papers.
.
Question no : 584 PM Execution Order Put in Process
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
The function of put in process does which of the following ?
(only one answer)
(A) Releases the order, prints the required order papers, and finally saves the order.
(B) Releases the order and prints the required order papers.
(C) Releases the order and saves the order.
(D) Releases the order, prints the required order papers, creates the necessary material or spare parts reservations, and finally saves the order.
(E) Release the order, prints the required order papers, creates spare parts reservations, perform availability check, and finally saves the order.
.
Unit 04 Breakdown Maintenance
The function of put in process does which of the following ?
(only one answer)
(A) Releases the order, prints the required order papers, and finally saves the order.
(B) Releases the order and prints the required order papers.
(C) Releases the order and saves the order.
(D) Releases the order, prints the required order papers, creates the necessary material or spare parts reservations, and finally saves the order.
(E) Release the order, prints the required order papers, creates spare parts reservations, perform availability check, and finally saves the order.
.
Sunday, October 17, 2010
Question no : 583 PM Execution Notification-Order interfaces
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
Select the True statements about Maintenance Notification and Maintenance Orders ?
(more than one answers)
(A) Maintenance Notification is a required pre-requisite step for maintenance order creation.
(B) Maintenance order creation can be created directly without any Maintenance notifications.
(C) Maintenance notifications created must follow up with a maintenance order or it cannot be closed.
(D) Maintenance notifications created may be independent of maintenance orders.
(E) If a Maintenance notifications does not exist, it can be generated via the Maintenance order.
.
Unit 04 Breakdown Maintenance
Select the True statements about Maintenance Notification and Maintenance Orders ?
(more than one answers)
(A) Maintenance Notification is a required pre-requisite step for maintenance order creation.
(B) Maintenance order creation can be created directly without any Maintenance notifications.
(C) Maintenance notifications created must follow up with a maintenance order or it cannot be closed.
(D) Maintenance notifications created may be independent of maintenance orders.
(E) If a Maintenance notifications does not exist, it can be generated via the Maintenance order.
.
Question no : 582 PM Execution Breakdown Scenario
PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance
The Breakdown Maintenance Process is characterized by ….
(only one answer)
(A) Notification, Planning, Capacity Planning, Execution, Completion.
(B) Notification, Planning, Scheduling, Capacity Planning, Execution, Completion.
(C) Notification, Scheduling, Capacity Planning, Execution, Completion.
(D) Notification, Scheduling, Execution, Completion.
(E) Notification, Order generation and release, Execution, Completion.
.
Unit 04 Breakdown Maintenance
The Breakdown Maintenance Process is characterized by ….
(only one answer)
(A) Notification, Planning, Capacity Planning, Execution, Completion.
(B) Notification, Planning, Scheduling, Capacity Planning, Execution, Completion.
(C) Notification, Scheduling, Capacity Planning, Execution, Completion.
(D) Notification, Scheduling, Execution, Completion.
(E) Notification, Order generation and release, Execution, Completion.
.
Question no : 580 Engineering Change Object Types
In SAP LDM Engineering Change Management ECC6.0, which of the following are valid object types to be included in an Engineering Change Process ?
(more then one answers)
(A) Object Dependency.
(B) Bill of Material.
(C) Task List.
(D) Characteristics.
(E) Material.
.
(more then one answers)
(A) Object Dependency.
(B) Bill of Material.
(C) Task List.
(D) Characteristics.
(E) Material.
.
Question no : 581 PM Execution Order Costing and BOM
PLM300 Plant Maintenance
Unit 03 Technical Objects
Which data element allows bills of materials to be created for different applications such as Costing, Production, Plant Maintenance.
(only one answer)
(A) BOM Application.
(B) BOM Type.
(C) BOM Status.
(D) BOM Usage.
(E) BOM Relevancy.
.
Unit 03 Technical Objects
Which data element allows bills of materials to be created for different applications such as Costing, Production, Plant Maintenance.
(only one answer)
(A) BOM Application.
(B) BOM Type.
(C) BOM Status.
(D) BOM Usage.
(E) BOM Relevancy.
.
Question no : 579 PM Master Data Equipment Concepts
PLM300 Plant Maintenance
Unit 03 Technical Objects
Which of the following fields can be assigned to the Equipment Master ?
(more than one answers)
(A) Main work center.
(B) Maintenance Planning Plant.
(C) Maintenance Plant.
(D) Cost center.
(E) Construction type.
.
Unit 03 Technical Objects
Which of the following fields can be assigned to the Equipment Master ?
(more than one answers)
(A) Main work center.
(B) Maintenance Planning Plant.
(C) Maintenance Plant.
(D) Cost center.
(E) Construction type.
.
Question no : 578 PM Master Data Equipment Replacement
PLM300 Plant Maintenance
Unit 03 Technical Objects
In case a piece of equipment is linked with a material, when it is dismantled; the damaged piece of equipment is …..
(only one answer)
(A) is scraped.
(B) is placed in quarantine.
(C) is placed in a storage location.
(D) is not allowed re-installation to another functional location.
(E) none of the above.
.
Unit 03 Technical Objects
In case a piece of equipment is linked with a material, when it is dismantled; the damaged piece of equipment is …..
(only one answer)
(A) is scraped.
(B) is placed in quarantine.
(C) is placed in a storage location.
(D) is not allowed re-installation to another functional location.
(E) none of the above.
.
Saturday, October 16, 2010
Question no : 577 PM Master Data Equipment Replacement
PLM300 Plant Maintenance
Unit 03 Technical Objects
The history of equipment installation and dismantling can be viewed through which report ?
(only one answer)
(A) List Editing.
(B) Change report.
(C) Usage List.
(D) Structural folder of Functional Location or Equipment Master.
(E) Structural folder of Equipment Master.
.
Unit 03 Technical Objects
The history of equipment installation and dismantling can be viewed through which report ?
(only one answer)
(A) List Editing.
(B) Change report.
(C) Usage List.
(D) Structural folder of Functional Location or Equipment Master.
(E) Structural folder of Equipment Master.
.
Question no : 576 PM Master Data Equipment Usage List
PLM300 Plant Maintenance
Unit 03 Technical Objects
Equipment Usage List documents which of the following data elements ?
(more than one answers)
(A) How many times an Equipment has been calibrated.
(B) The maintenance task lists assigned to the equipment.
(C) Installation and dismantling data on the equipment.
(D) The installation locations for equipment within a technical system.
(E) Documentation of field content changes.
.
Unit 03 Technical Objects
Equipment Usage List documents which of the following data elements ?
(more than one answers)
(A) How many times an Equipment has been calibrated.
(B) The maintenance task lists assigned to the equipment.
(C) Installation and dismantling data on the equipment.
(D) The installation locations for equipment within a technical system.
(E) Documentation of field content changes.
.
Friday, October 15, 2010
Question no : 575 PM Master Data Equipment Installation
PLM300 Plant Maintenance
Unit 03 Technical Objects
An Equipment cannot be installed at a functional location, what are the possible causes ?
(more than one answers)
(A) The option Equipment installation allowed is not set at the Functional Location.
(B) The option Equipment installation allowed is not set at the Functional Location or Equipment master.
(C) The Equipment category of the equipment master does not allow installation.
(D) The Equipment master has not been released for installation.
(E) The Functional Location has too many equipments assigned to it.
.
Unit 03 Technical Objects
An Equipment cannot be installed at a functional location, what are the possible causes ?
(more than one answers)
(A) The option Equipment installation allowed is not set at the Functional Location.
(B) The option Equipment installation allowed is not set at the Functional Location or Equipment master.
(C) The Equipment category of the equipment master does not allow installation.
(D) The Equipment master has not been released for installation.
(E) The Functional Location has too many equipments assigned to it.
.
Question no : 574 PM Master Data Equipment Concepts
PLM300 Plant Maintenance
Unit 03 Technical Objects
What are the objects can be assigned or link to the Equipment ?
(more than one answers)
(A) Functional Location.
(B) Material number.
(C) Asset number.
(D) BOM.
(E) Maintenance Work Center.
.
Unit 03 Technical Objects
What are the objects can be assigned or link to the Equipment ?
(more than one answers)
(A) Functional Location.
(B) Material number.
(C) Asset number.
(D) BOM.
(E) Maintenance Work Center.
.
Question no : 573 PM Master Data Construction Type
PLM300 Plant Maintenance
Unit 03 Technical Objects
The purpose of the Construction type is to assign a __________ to the technical object.
(more than one answers)
(A) Equipment BOM
(B) Material BOM
(C) Technical object BOM
(D) Functional Location BOM
(E) Construction BOM
.
Unit 03 Technical Objects
The purpose of the Construction type is to assign a __________ to the technical object.
(more than one answers)
(A) Equipment BOM
(B) Material BOM
(C) Technical object BOM
(D) Functional Location BOM
(E) Construction BOM
.
Thursday, October 14, 2010
Question no : 572 PM Master Data Technical Object Basics
PLM300 Plant Maintenance
Unit 03 Technical Objects
Which of the following statements are not true about Technical Objects ?
(more than one answers)
(A) Only one sub-equipment can be assigned to each equipment.
(B) The functional location category will determine equipment assignment allowance to a functional location.
(C) The maximum level of an equipment hierarchy is 40 levels.
(D) An equipment number can be created using internal or external number range assignment.
(E) An equipment number can be assigned to one or more functional locations at the same time.
.
Unit 03 Technical Objects
Which of the following statements are not true about Technical Objects ?
(more than one answers)
(A) Only one sub-equipment can be assigned to each equipment.
(B) The functional location category will determine equipment assignment allowance to a functional location.
(C) The maximum level of an equipment hierarchy is 40 levels.
(D) An equipment number can be created using internal or external number range assignment.
(E) An equipment number can be assigned to one or more functional locations at the same time.
.
Question no : 571 PM Master Data Functional Location Concepts
PLM300 Plant Maintenance
Unit 03 Technical Objects
You can assign the following objects to a functional location:
(more than one answers)
(A) Functional location.
(B) Material and its Bills of Material.
(C) Equipment.
(D) Planner group.
(E) Work Center.
.
Unit 03 Technical Objects
You can assign the following objects to a functional location:
(more than one answers)
(A) Functional location.
(B) Material and its Bills of Material.
(C) Equipment.
(D) Planner group.
(E) Work Center.
.
Question no : 570 PM Master Data Functional Location Characteristics
PLM300 Plant Maintenance
Unit 03 Technical Objects
Functional Location Master record has the following characteristics and data contents.
(more than one answers)
(A) Classification data.
(B) Organizational view of account assignment (maintenance plant, company code, and cost center).
(C) Equipment assignment.
(D) Document links from the DMS.
(E) Measurement points and counters assignment.
.
Unit 03 Technical Objects
Functional Location Master record has the following characteristics and data contents.
(more than one answers)
(A) Classification data.
(B) Organizational view of account assignment (maintenance plant, company code, and cost center).
(C) Equipment assignment.
(D) Document links from the DMS.
(E) Measurement points and counters assignment.
.
Wednesday, October 13, 2010
Question no : 569 PM Master Data Functional Location Creation
PLM300 Plant Maintenance
Unit 03 Technical Objects
When creating a functional location, ……
(only one answer)
(A) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s if the option is selected in the initial screen.
(B) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s and save it without including it in the existing structure.
(C) The system checks whether the new functional location fits the existing structure indicator’s hierarchy; if the new identification created differs from the structure indicator’s coding template, it is considered external number range and is saved without further checking by the system.
(D) The system does not check the new functional location fit against existing hierarchy if the structure indicator is not entered.
(E) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s and possible including it in the existing structure.
.
Unit 03 Technical Objects
When creating a functional location, ……
(only one answer)
(A) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s if the option is selected in the initial screen.
(B) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s and save it without including it in the existing structure.
(C) The system checks whether the new functional location fits the existing structure indicator’s hierarchy; if the new identification created differs from the structure indicator’s coding template, it is considered external number range and is saved without further checking by the system.
(D) The system does not check the new functional location fit against existing hierarchy if the structure indicator is not entered.
(E) The system checks whether the new functional location fits the existing structure indicator’s hierarchy’s and possible including it in the existing structure.
.
Question no : 568 PM Master Data Functional Location Concepts
PLM300 Plant Maintenance
Unit 03 Technical Objects
When defining Functional Locations, the following sequence of activities are recommend. Select the correct sequence of activities from the list below ?
(only one answer)
I Choose the structuring instrument for each object.
II Create the technical characteristics and task list.
III Link the technical object to the Document Management System.
IV Identify which objects are relevant for Plant Maintenance.
(A) I, II, III, IV
(B) I, III, IV
(C) IV, I, II, III
(D) IV, I, II
(E) IV, I, III, II
.
Unit 03 Technical Objects
When defining Functional Locations, the following sequence of activities are recommend. Select the correct sequence of activities from the list below ?
(only one answer)
I Choose the structuring instrument for each object.
II Create the technical characteristics and task list.
III Link the technical object to the Document Management System.
IV Identify which objects are relevant for Plant Maintenance.
(A) I, II, III, IV
(B) I, III, IV
(C) IV, I, II, III
(D) IV, I, II
(E) IV, I, III, II
.
Question no : 567 PM Master Data Structural Indicator
PLM300 Plant Maintenance
Unit 03 Technical Objects
Which of the following statements are True about the Structural Indicator ?
(more than one answers)
(A) It has 40 maximum possible length of definition.
(B) It has a hierarchical level of 9 levels.
(C) The coding template only allows numeric, alphanumeric, or hyphen only.
(D) Space and special character are not allowed between the coding characters in the coding template.
(E) Structural Indicator is optional for Functional Location creation if a hierarchical level is not desired.
.
Unit 03 Technical Objects
Which of the following statements are True about the Structural Indicator ?
(more than one answers)
(A) It has 40 maximum possible length of definition.
(B) It has a hierarchical level of 9 levels.
(C) The coding template only allows numeric, alphanumeric, or hyphen only.
(D) Space and special character are not allowed between the coding characters in the coding template.
(E) Structural Indicator is optional for Functional Location creation if a hierarchical level is not desired.
.
Tuesday, October 12, 2010
Question no : 566 PM Master Data Functional Location Concepts
PLM300 Plant Maintenance
Unit 03 Technical Objects
Possible criteria’s for functional location definition are:
(more than one answers)
(A) Structural.
(B) Spatial.
(C) Technical.
(D) Functional.
(E) Financial.
.
Unit 03 Technical Objects
Possible criteria’s for functional location definition are:
(more than one answers)
(A) Structural.
(B) Spatial.
(C) Technical.
(D) Functional.
(E) Financial.
.
Question no : 565 PM Master Data Functional Location Decisions
PLM300 Plant Maintenance
Unit 03 Technical Objects
What are the justifications possible for deciding necessity for functional location creation ?
(more than one answers)
(A) For the size of the technical system requires a finite definition of the structures of the technical systems according to its functional process or location for clear identification of maintenance requirement, maintenance data collection, and analysis.
(B) To analyze the effects of the usage conditions have to the damage possibilities of the equipment installed.
(C) The storage location of the technical system has to be identified for the purpose of spare part procurement planning and storage.
(D) The costs of the maintenance work or tasks have to be captured and monitored for certain parts of the technical system.
(E) Technical data for certain parts of the technical system has to be stored and evaluated for over a period of time.
.
Unit 03 Technical Objects
What are the justifications possible for deciding necessity for functional location creation ?
(more than one answers)
(A) For the size of the technical system requires a finite definition of the structures of the technical systems according to its functional process or location for clear identification of maintenance requirement, maintenance data collection, and analysis.
(B) To analyze the effects of the usage conditions have to the damage possibilities of the equipment installed.
(C) The storage location of the technical system has to be identified for the purpose of spare part procurement planning and storage.
(D) The costs of the maintenance work or tasks have to be captured and monitored for certain parts of the technical system.
(E) Technical data for certain parts of the technical system has to be stored and evaluated for over a period of time.
.
Question no : 564 PM Master Data Maintenance Plant Assignment
PLM300 Plant Maintenance
Unit 03 Technical Objects
Which of the following organizational elements are defaulted when the maintenance plant is allocated to a technical object such as an Equipment ?
(more then one answers)
A) Company Code.
B) Planning Plant.
C) Cost Center.
D) Maintenance Work Center.
E) Controlling Area.
.
Unit 03 Technical Objects
Which of the following organizational elements are defaulted when the maintenance plant is allocated to a technical object such as an Equipment ?
(more then one answers)
A) Company Code.
B) Planning Plant.
C) Cost Center.
D) Maintenance Work Center.
E) Controlling Area.
.
Question no : 563 PM Organization Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Which of the following statements are NOT TRUE ?
(More then one answer)
A) A planning plant can be assigned to more then one maintenance plant.
B) One of the purpose of maintenance plant is to define the location of a technical object.
C) A maintenance plant cannot be a planning plant at the same time.
D) A planning plant need not be assigned to a company code.
E) Planner Groups are to be created against both the planning plant and maintenance plant for the functions of planning and execution to be realized.
Unit 02 Plant Maintenance Organization
Which of the following statements are NOT TRUE ?
(More then one answer)
A) A planning plant can be assigned to more then one maintenance plant.
B) One of the purpose of maintenance plant is to define the location of a technical object.
C) A maintenance plant cannot be a planning plant at the same time.
D) A planning plant need not be assigned to a company code.
E) Planner Groups are to be created against both the planning plant and maintenance plant for the functions of planning and execution to be realized.
Monday, October 11, 2010
Question no : 562 PM General Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
The following functions and features are part of the Plant Maintenance Solution …..
(only one answer)
I Work Clearance Management
II Maintenance Notifications
III Structuring of Technical Systems
IV Preventive Maintenance
V Solution Database
VI Maintenance Order Processing
(A) I, II, IV, V, VI
(B) III, IV, V, VI
(C) II, III, IV, V, VI
(D) I, II, III, IV, VI
(E) I, II, III, IV, V, VI
.
Unit 02 Plant Maintenance Organization
The following functions and features are part of the Plant Maintenance Solution …..
(only one answer)
I Work Clearance Management
II Maintenance Notifications
III Structuring of Technical Systems
IV Preventive Maintenance
V Solution Database
VI Maintenance Order Processing
(A) I, II, IV, V, VI
(B) III, IV, V, VI
(C) II, III, IV, V, VI
(D) I, II, III, IV, VI
(E) I, II, III, IV, V, VI
.
Question no : 561 PM General Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
The sequential steps of Plant Maintenance organizational level structuring process is which of the following ?
(only one answer)
(A) Analyze, Define, Assign.
(B) Analyze, Assign, Define.
(C) Analyze, Define, Refine.
(D) Analyze, Configure, Define.
(E) Analyze, Define, Implement.
.
Unit 02 Plant Maintenance Organization
The sequential steps of Plant Maintenance organizational level structuring process is which of the following ?
(only one answer)
(A) Analyze, Define, Assign.
(B) Analyze, Assign, Define.
(C) Analyze, Define, Refine.
(D) Analyze, Configure, Define.
(E) Analyze, Define, Implement.
.
Question no : 560 PM Master Data Work Center Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Main functions of the Work center are:
(more than one answers)
(A) Costing.
(B) Scheduling.
(C) Capacity planning.
(D) Default values for task list data maintenance.
(E) Link to spare parts requirements.
.
Unit 02 Plant Maintenance Organization
Main functions of the Work center are:
(more than one answers)
(A) Costing.
(B) Scheduling.
(C) Capacity planning.
(D) Default values for task list data maintenance.
(E) Link to spare parts requirements.
.
Sunday, October 10, 2010
Question no : 559 PM Organization Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
For a Manufacturing facility, it implements the Plant Maintenance Plant-specific planning scenario where only a single plant is used where all planning and maintenance activities are in one plant, ……
(more than one answers)
(A) The Maintenance Plant is also the Maintenance Planning Plant.
(B) Maintenance requirements may be planned in the same plant where it occurs; therefore, the Maintenance Plant = Maintenance Planning Plant = Logistics Plant.
(C) The Maintenance workshops and spare parts storage could either be at the same plant where the maintenance and planning occurs OR at another plant.
(D) Multiple Maintenance Plants are assigned to a Maintenance Planning Plant.
(E) The Procurement and Storage of spare parts could be at the same plant where the maintenance activity and maintenance planning is occurring.
.
Unit 02 Plant Maintenance Organization
For a Manufacturing facility, it implements the Plant Maintenance Plant-specific planning scenario where only a single plant is used where all planning and maintenance activities are in one plant, ……
(more than one answers)
(A) The Maintenance Plant is also the Maintenance Planning Plant.
(B) Maintenance requirements may be planned in the same plant where it occurs; therefore, the Maintenance Plant = Maintenance Planning Plant = Logistics Plant.
(C) The Maintenance workshops and spare parts storage could either be at the same plant where the maintenance and planning occurs OR at another plant.
(D) Multiple Maintenance Plants are assigned to a Maintenance Planning Plant.
(E) The Procurement and Storage of spare parts could be at the same plant where the maintenance activity and maintenance planning is occurring.
.
Saturday, October 9, 2010
Question no : 558 PM Organization Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Which of the following organization structuring setup are correct ?
(more than one answers)
(A) A Maintenance Plant can also be a Maintenance Planning Plant.
(B) When a Logistics Plant is first generated, it is also automatically generated as a Maintenance Plant.
(C) If Maintenance and Planning are carried out in same the Logistics Plant all the time; the Logistics Plant is also the Maintenance Plant as well as the Maintenance Planning Plant.
(D) Maintenance Work Centers are assigned to the Maintenance Plant or the Maintenance Planning Plant depending on the Plant Maintenance Scenario.
(E) Maintenance Planner Groups are assigned to the Maintenance Planning Plant.
.
Unit 02 Plant Maintenance Organization
Which of the following organization structuring setup are correct ?
(more than one answers)
(A) A Maintenance Plant can also be a Maintenance Planning Plant.
(B) When a Logistics Plant is first generated, it is also automatically generated as a Maintenance Plant.
(C) If Maintenance and Planning are carried out in same the Logistics Plant all the time; the Logistics Plant is also the Maintenance Plant as well as the Maintenance Planning Plant.
(D) Maintenance Work Centers are assigned to the Maintenance Plant or the Maintenance Planning Plant depending on the Plant Maintenance Scenario.
(E) Maintenance Planner Groups are assigned to the Maintenance Planning Plant.
.
Question no : 557 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
“Assess existing structures such as Financial Accounting, Controlling, Materials Management from the Plant Maintenance perspective and choices available to extend them to include the maintenance-specific organization structures.” is a which part of the process step in the Organizational Structuring exercise in Plant Maintenance ?
(only one answer)
(A) Configure
(B) Define
(C) Design
(D) Refine
(E) Analyze
.
Unit 02 Plant Maintenance Organization
“Assess existing structures such as Financial Accounting, Controlling, Materials Management from the Plant Maintenance perspective and choices available to extend them to include the maintenance-specific organization structures.” is a which part of the process step in the Organizational Structuring exercise in Plant Maintenance ?
(only one answer)
(A) Configure
(B) Define
(C) Design
(D) Refine
(E) Analyze
.
Question no : 556 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Supply Network Planning, Demand Planning, Campaign Management, Sales Force Automation, and Global Available to Promise are component solutions for which of the following Cross Industry Solutions ?
(more than one answers)
(A) mySAP Advanced Planner and Optimizer
(B) mySAP Production Planning and Execution
(C) mySAP Customer Relationship Management
(D) mySAP Marketplace
(E) mySAP Business Intelligence
.
Unit 02 Plant Maintenance Organization
Supply Network Planning, Demand Planning, Campaign Management, Sales Force Automation, and Global Available to Promise are component solutions for which of the following Cross Industry Solutions ?
(more than one answers)
(A) mySAP Advanced Planner and Optimizer
(B) mySAP Production Planning and Execution
(C) mySAP Customer Relationship Management
(D) mySAP Marketplace
(E) mySAP Business Intelligence
.
Friday, October 8, 2010
Question no : 555 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Solution Database is a component of Asset Life-Cycle Management with possible usage at which phase of the Product Life-Cycle ?
(more than one answers)
(A) Product idea to Start of Production/Operation.
(B) Start of Production/Operation to End of Production/Operation.
(C) End of Operation
(D) End of Production/Operation to Product Phase-out.
(E) End of Production/Operation to Replacement.
.
Unit 02 Plant Maintenance Organization
Solution Database is a component of Asset Life-Cycle Management with possible usage at which phase of the Product Life-Cycle ?
(more than one answers)
(A) Product idea to Start of Production/Operation.
(B) Start of Production/Operation to End of Production/Operation.
(C) End of Operation
(D) End of Production/Operation to Product Phase-out.
(E) End of Production/Operation to Replacement.
.
Question no : 554 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Which of the following components solutions are integral components of the Asset Life-Cycle Management within the mySAP PLM Solution ?
(only one answer)
(A) Life-Cycle Management, Plant Maintenance.
(B) Asset Management, Plant Maintenance.
(C) Plant Maintenance, Customer Service and Asset Management Integration.
(D) Plant Maintenance, Life-Cycle Service Management.
(E) Life-Cycle Service & Asset Management, Plant Maintenance.
.
Unit 02 Plant Maintenance Organization
Which of the following components solutions are integral components of the Asset Life-Cycle Management within the mySAP PLM Solution ?
(only one answer)
(A) Life-Cycle Management, Plant Maintenance.
(B) Asset Management, Plant Maintenance.
(C) Plant Maintenance, Customer Service and Asset Management Integration.
(D) Plant Maintenance, Life-Cycle Service Management.
(E) Life-Cycle Service & Asset Management, Plant Maintenance.
.
Question no : 553 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Plant Maintenance Process comprises the following tasks:
(only one answer)
(A) Inspection, Construction, Preventive Maintenance.
(B) Inspection, Repair, Preventive Maintenance.
(C) Inspection, Calibration, Repair.
(D) Repair, Calibration, Preventive Maintenance.
(E) Repair, Construction, Preventive Maintenance.
.
Unit 02 Plant Maintenance Organization
Plant Maintenance Process comprises the following tasks:
(only one answer)
(A) Inspection, Construction, Preventive Maintenance.
(B) Inspection, Repair, Preventive Maintenance.
(C) Inspection, Calibration, Repair.
(D) Repair, Calibration, Preventive Maintenance.
(E) Repair, Construction, Preventive Maintenance.
.
Question no : 552 PM Basic Concepts
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Which statement contents depicts the major components of mySAP PLM ?
(only one answer)
I Life-Cycle Data Management
II Mobile PLM Solutions
III Quality Management
IV PLM Focused Business Warehouse
V Program and Project Management
VI Asset Life-Cycle Management
VII PLM Enterprise Portal
VIII Environment, Health & Safety
(A) I, III, V, VI, VII, VIII
(B) I, II, III, V, VI, VIII
(C) I, III, V, VI, VIII
(D) I, II, III, V, VI, VII, VIII
(E) I, II, III, IV, V, VI, VII, VIII
.
Unit 02 Plant Maintenance Organization
Which statement contents depicts the major components of mySAP PLM ?
(only one answer)
I Life-Cycle Data Management
II Mobile PLM Solutions
III Quality Management
IV PLM Focused Business Warehouse
V Program and Project Management
VI Asset Life-Cycle Management
VII PLM Enterprise Portal
VIII Environment, Health & Safety
(A) I, III, V, VI, VII, VIII
(B) I, II, III, V, VI, VIII
(C) I, III, V, VI, VIII
(D) I, II, III, V, VI, VII, VIII
(E) I, II, III, IV, V, VI, VII, VIII
.
Thursday, October 7, 2010
Question no : 550 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following screen element provide basic information on user logon, system, client, and session no ?
(only one answer)
(A) System status.
(B) Status bar.
(C) Command box.
(D) Application tool bar.
(E) Title bar.
.
Unit 01 SAP Enterprise Navigation
Which of the following screen element provide basic information on user logon, system, client, and session no ?
(only one answer)
(A) System status.
(B) Status bar.
(C) Command box.
(D) Application tool bar.
(E) Title bar.
.
Question no : 549 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following user data elements can be maintained by individual users ?
(more than one answers)
(A) Default printer.
(B) Default logon language.
(C) Default decimal point notation.
(D) Parameter ID values.
(E) Date Format.
.
Unit 01 SAP Enterprise Navigation
Which of the following user data elements can be maintained by individual users ?
(more than one answers)
(A) Default printer.
(B) Default logon language.
(C) Default decimal point notation.
(D) Parameter ID values.
(E) Date Format.
.
Question no : 551 PM Organization Structure Configuration
PLM300 Plant Maintenance
Unit 02 Plant Maintenance Organization
Project IMG views are created for ……….
(only one answer)
(A) A checklist for the Customizing activities that should be configured for each Project IMG to process project documentation, project-wide documentation, and relevant information on project information.
(B) Necessary as the project IMG itself do not allow configuration and documentation, there is a minimum of one project IMG view for each Project IMG to process project documentation, project-wide documentation, and relevant information on project information.
(C) Link to ASAP directly for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
(D) Better interface screens for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
(E) Better structuring for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
.
Unit 02 Plant Maintenance Organization
Project IMG views are created for ……….
(only one answer)
(A) A checklist for the Customizing activities that should be configured for each Project IMG to process project documentation, project-wide documentation, and relevant information on project information.
(B) Necessary as the project IMG itself do not allow configuration and documentation, there is a minimum of one project IMG view for each Project IMG to process project documentation, project-wide documentation, and relevant information on project information.
(C) Link to ASAP directly for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
(D) Better interface screens for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
(E) Better structuring for the project IMGs to process project documentation, project-wide documentation, and relevant information on project information.
.
Wednesday, October 6, 2010
Question no : 548 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
What system fields allows you to add graphics, re-arrange fields, add push buttons and change input fields into radio buttons ?
(only one answer)
(A) SAP Enhancer.
(B) Profile Generator.
(C) SAP Interwise.
(D) SAP Show
(E) GuiXT.
.
Unit 01 SAP Enterprise Navigation
What system fields allows you to add graphics, re-arrange fields, add push buttons and change input fields into radio buttons ?
(only one answer)
(A) SAP Enhancer.
(B) Profile Generator.
(C) SAP Interwise.
(D) SAP Show
(E) GuiXT.
.
Question no : 547 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
The Enjoy SAP initiatives is focused on.
(only one answer)
(A) Role-Based Menu.
(B) The SAP User.
(C) SAP Netweaver Enabled transactions.
(D) Web-enabled transactions.
(E) The Business Framework.
.
Unit 01 SAP Enterprise Navigation
The Enjoy SAP initiatives is focused on.
(only one answer)
(A) Role-Based Menu.
(B) The SAP User.
(C) SAP Netweaver Enabled transactions.
(D) Web-enabled transactions.
(E) The Business Framework.
.
Question no : 546 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
In addition to the standard enhancements with the Enjoy SAP Release, Plant Maintenance now allows users and company preferences for
(more than one answers)
(A) Table Control.
(B) Object services to send mails or attachments.
(C) New screen interactions designs.
(D) Tab Strips.
(E) ABAP List Viewer.
.
Unit 01 SAP Enterprise Navigation
In addition to the standard enhancements with the Enjoy SAP Release, Plant Maintenance now allows users and company preferences for
(more than one answers)
(A) Table Control.
(B) Object services to send mails or attachments.
(C) New screen interactions designs.
(D) Tab Strips.
(E) ABAP List Viewer.
.
Tuesday, October 5, 2010
Question no : 545 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Information of the Status Bar at the bottom right of the SAP screen provides ….
(more than one answers)
(A) Session number.
(B) Client number.
(C) Parameter ID.
(D) Transaction code.
(E) User logon ID.
.
Unit 01 SAP Enterprise Navigation
Information of the Status Bar at the bottom right of the SAP screen provides ….
(more than one answers)
(A) Session number.
(B) Client number.
(C) Parameter ID.
(D) Transaction code.
(E) User logon ID.
.
Question no : 544 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
A warning message appears if the same user attempts to log on to the same client more than once. The message offers the user which of the following options to proceed ?
(more than one answers)
(A) Continue with the new logon and end any other logons in the system.
(B) Continue with the new logon without ending any other logons in the system.
(C) Issue a message to the system administrator and terminate all other logons in the system.
(D) Continue with the new logon and locked any other logons in the system.
(E) Terminate the new logon attempt.
.
Unit 01 SAP Enterprise Navigation
A warning message appears if the same user attempts to log on to the same client more than once. The message offers the user which of the following options to proceed ?
(more than one answers)
(A) Continue with the new logon and end any other logons in the system.
(B) Continue with the new logon without ending any other logons in the system.
(C) Issue a message to the system administrator and terminate all other logons in the system.
(D) Continue with the new logon and locked any other logons in the system.
(E) Terminate the new logon attempt.
.
Question no : 543 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Extra -> Administration Information allows you to find out about ……
(only one answer)
(A) Detail information of the screen logo setup on the SAP Easy Access screen.
(B) Detail information of the Administrative functions available for the user.
(C) Detail information and settings allowed of the Administrative functions on the SAP Easy Access screen.
(D) Detail information of the current authorization levels of the user login.
(E) Detail information of the SAP Gui currently installed.
.
Unit 01 SAP Enterprise Navigation
Extra -> Administration Information allows you to find out about ……
(only one answer)
(A) Detail information of the screen logo setup on the SAP Easy Access screen.
(B) Detail information of the Administrative functions available for the user.
(C) Detail information and settings allowed of the Administrative functions on the SAP Easy Access screen.
(D) Detail information of the current authorization levels of the user login.
(E) Detail information of the SAP Gui currently installed.
.
Monday, October 4, 2010
Question no : 542 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Current you do not have access to 2 clients of an R/3 system (client 900 for testing and client 902 for configuration). In order to login to both clients, you need to …..
(only one answer)
(A) 1 Single-Sign-On (SSO) login user master record to access both clients.
(B) 1 user master record with a cross client Role-Based menu to access both clients.
(C) 1 user master record to access both clients.
(D) 2 user master records, 1 to access each client.
(E) 1 super user master record to access both clients.
.
Unit 01 SAP Enterprise Navigation
Current you do not have access to 2 clients of an R/3 system (client 900 for testing and client 902 for configuration). In order to login to both clients, you need to …..
(only one answer)
(A) 1 Single-Sign-On (SSO) login user master record to access both clients.
(B) 1 user master record with a cross client Role-Based menu to access both clients.
(C) 1 user master record to access both clients.
(D) 2 user master records, 1 to access each client.
(E) 1 super user master record to access both clients.
.
Question no : 541 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
By Selecting Function key “F1” and then choose “Technical Info” on a particular field will allow you to access ….
(more than one answers)
(A) the authorization levels assigned to the selected field.
(B) the default values assigned to the selected field.
(C) the length and data type of the selected field.
(D) the Table and field name of the selected field.
(E) the Parameter ID of the selected field.
.
Unit 01 SAP Enterprise Navigation
By Selecting Function key “F1” and then choose “Technical Info” on a particular field will allow you to access ….
(more than one answers)
(A) the authorization levels assigned to the selected field.
(B) the default values assigned to the selected field.
(C) the length and data type of the selected field.
(D) the Table and field name of the selected field.
(E) the Parameter ID of the selected field.
.
Question no : 540 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following accesses can be assigned or created to the Favorites menu ?
(more than one answers)
(A) Internet address.
(B) Intranet address.
(C) Folders.
(D) Transaction codes.
(E) Multi-level structure Folders.
.
Unit 01 SAP Enterprise Navigation
Which of the following accesses can be assigned or created to the Favorites menu ?
(more than one answers)
(A) Internet address.
(B) Intranet address.
(C) Folders.
(D) Transaction codes.
(E) Multi-level structure Folders.
.
Sunday, October 3, 2010
Question no : 539 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
System -> User Profile -> Own Data …….
(only one answer)
(A) Will open a new session for the User Profile transaction.
(B) Will close the current session and switch to the User Profile transaction.
(C) Allows the user to change authorization access to the SAP menu.
(D) Allows setting display options such as “New Visual Design”, “GuiXT’, etc.
(E) Is accessible by the system administrator login only to change default values for the user.
Unit 01 SAP Enterprise Navigation
System -> User Profile -> Own Data …….
(only one answer)
(A) Will open a new session for the User Profile transaction.
(B) Will close the current session and switch to the User Profile transaction.
(C) Allows the user to change authorization access to the SAP menu.
(D) Allows setting display options such as “New Visual Design”, “GuiXT’, etc.
(E) Is accessible by the system administrator login only to change default values for the user.
Question no : 538 PM Basic Navigation
As at ECC6.0 (there may not be any exam question on navigation but here is one)
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following screen elements in the initial screen can be altered by selecting Extras -> Settings ?
(more than one answers)
(A) Display technical name of the transaction code in the menu.
(B) Display technical name of the transaction code in the Role-Based menu but not the SAP Standard Menu.
(C) Display technical name of the transaction code in the SAP Standard Menu but not in the Role-Based menu.
(D) Removing the Favorites menu display.
(E) Display the Favorites menu at end of the list in the menu.
.
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following screen elements in the initial screen can be altered by selecting Extras -> Settings ?
(more than one answers)
(A) Display technical name of the transaction code in the menu.
(B) Display technical name of the transaction code in the Role-Based menu but not the SAP Standard Menu.
(C) Display technical name of the transaction code in the SAP Standard Menu but not in the Role-Based menu.
(D) Removing the Favorites menu display.
(E) Display the Favorites menu at end of the list in the menu.
.
Saturday, October 2, 2010
Question no : 537 PM Basic Navigation
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
The following default values can be set in the User Profile.
(more than one answers)
(A) Login Language.
(B) Printer.
(C) Date Format.
(D) Decimal Format.
(E) Client number login.
.
Unit 01 SAP Enterprise Navigation
The following default values can be set in the User Profile.
(more than one answers)
(A) Login Language.
(B) Printer.
(C) Date Format.
(D) Decimal Format.
(E) Client number login.
.
Question no : 536 PM Basic Navigations
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
Which of the following statements are True regarding transaction or sessions access in SAP R/3 ?
(more than one answers)
(A) Use “/n” + Transaction code in the command box to switch to the intended session.
(B) A user login can access up to a maximum of 8 sessions.
(C) A user login can access up to 6 or less sessions.
(D) Use “/o” + Transaction code in the command box to open a new session for the intended transaction.
(E) A user can use 2 sessions to open the same transaction code.
.
Unit 01 SAP Enterprise Navigation
Which of the following statements are True regarding transaction or sessions access in SAP R/3 ?
(more than one answers)
(A) Use “/n” + Transaction code in the command box to switch to the intended session.
(B) A user login can access up to a maximum of 8 sessions.
(C) A user login can access up to 6 or less sessions.
(D) Use “/o” + Transaction code in the command box to open a new session for the intended transaction.
(E) A user can use 2 sessions to open the same transaction code.
.
Question no : 535 PM Basic Navigations
PLM300 Plant Maintenance
Unit 01 SAP Enterprise Navigation
A maintenance engineer only works at Maintenance Plant 1000. When he access any transactions that has the Maintenance Plant as an entry field; value 1000 should be defaulted to that field. How should this be achieved ?
(only one answer)
(A) Save the default value of ‘1000’ at the Enterprise IMG Customizing.
(B) Use user exits provided within the Plant Maintenance module to default the value ‘1000’
(C) Set the default value of ‘1000’ using Parameter ID in the User Profile.
(D) Assign the default value of ‘1000’ within the Profile Generator.
(E) Assign the default value of ‘1000’ at the Start Menu.
.
Unit 01 SAP Enterprise Navigation
A maintenance engineer only works at Maintenance Plant 1000. When he access any transactions that has the Maintenance Plant as an entry field; value 1000 should be defaulted to that field. How should this be achieved ?
(only one answer)
(A) Save the default value of ‘1000’ at the Enterprise IMG Customizing.
(B) Use user exits provided within the Plant Maintenance module to default the value ‘1000’
(C) Set the default value of ‘1000’ using Parameter ID in the User Profile.
(D) Assign the default value of ‘1000’ within the Profile Generator.
(E) Assign the default value of ‘1000’ at the Start Menu.
.
Friday, October 1, 2010
Question no : 533 ERP Basics Organizational Assignments
TERP10 Unit 1 ERP Basics
.
Which of the following organizational assignment is not possible ?
(Select ONE best answer)
A) Assigning multiple company code to a controlling area.
B) Assigning multiple plant to a company code.
C) Assigning multiple purchasing organization to a company code.
D) Assigning multiple sales organization to a company code.
E) Assigning multiple shipping point to a company code.
.
Subscribe to:
Posts (Atom)