This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Monday, May 31, 2021

Question no 3846 : Inbound Delivery

In SAP MM as at ECC6.0 EhP6, which of the following ensure Inbound Delivery is mandatory for a Material in the Purchase Order ?

(only one answer)

A)  Shipping Instruction.
B)  Purchasing Value Key.
C)  Confirmation Control Key.
D)  Shipping Point.
E)  Inbound indicator in the Delivery TAB.
.

Answer: C

SPRO->Materials Management->Purchasing->Confirmations->Set Up Confirmation Control.
Select the "Inbound Delivery" indicator.

Wednesday, May 26, 2021

Question no 3845 : Purchasing Value Key

In SAP MM as at ECC6.0 EhP6, which of the following can be set with the Purchasing Value Key ?

(more than one answers)

A)  Order acknowledgement indicator.
B)  Under and Over delivery tolerances.
C)  Reminder in days.
D)  Vendor evaluation calculation parameters.
E)  Planned delivery time.
.

Answers: A, B, C, D

IMG - MM - Purchasing - Material Master - Define Purchasing Value Key

Tuesday, May 25, 2021

Question no 3844 : Temporary Block Vendor

In SAP MM as at ECC6.0 EhP6, which of the following temporary block a vendor in the Quota Arrangement to be selected during Source Determination ?

(only one answer)

A)  Delete the vendor in the Quota Arrangement.
B)  Set the validity date of the vendor to be blocked.
C)  Set the Quota Based Qty to a high value.
D)  Click the Block indicator in the Quota Arrangement.
E)  Set the Quota for that vendor to zero.
.

Answer: C

The Calculated Quota Rating is used for vendor selection. When the Quota Based Qty is a high value, the Quota Rating will be a low value hence the vendor is not selected.

Friday, May 21, 2021

Question no 3843 : MRP run generating PR

In SAP MM/PP as at ECC6.0 EhP6, which of the following data is used to derived dates for Purchasing Requisition in MRP run ?

(more than one answers)

A)  Opening period.
B)  Purchasing processing time.
C)  Planned delivery time.
D)  GR processing time.
E)  Released period.
.

Answers: B, C, D

A) Opening period is for Planned Orders.
E) Released Period is for Production Orders.

Wednesday, May 19, 2021

Exclude Storage Location Stocks in S/4

 

click "here" to view the Presentation

Question no 3842 : Purchasing Processing Time

In SAP MM/PP MRP as at ECC6.0 EhP6, how is the Purchasing Processing Time is set ?

(only one answer)

A)  Material Master MRP 2 data view.
B)  MRP Group parameter.
C)  Plant parameter.
D)  Scheduling Margin Key.
E)  Purchasing Info Record.
.

Answer: C

OPPQ

Tuesday, May 18, 2021

Question no 3841 : MRP Dates

In SAP MM/PP as at ECC6.0 EhP6, which of the following are TRUE when:
Opening period = 0 days
Planned Delivery Time = 5 days
GR Processing time = 0 days

(more than one answers)

A)  Opening date = Order finish date.
B)  Opening date = Order start date.
C)  Order start date = Order finish date.
D)  Stock available date = Order finish date.
E)  Opening date = Stock available date.
.

Answers: B, D

Opening date + Opening period = Order start date
Order start date + Planned delivery time = Order finish date
Order finish date + GR processing time = Stock available date

Monday, May 17, 2021

Question no 3840 : Automatic Re-Order Point

In SAP MM/PP as at ECC6.0 EhP6, which of the following variables are required in the Material Master for automatically calculating Re-Order Point ?

(more than one answers)

A)  Service Level.
B)  Safety Stock.
C)  Consumption Values.
D)  Replenishment Lead Time.
E)  Opening period.
.

Answers: A, B, C, D

The following values are important for defining the reorder point:
    Safety stock
    Average consumption
    Replenishment lead time
The following values are important for defining the safety stock:
    Past consumption values (historical data) or future requirements
    Vendor/production delivery timelines
    Service level to be achieved
    Forecast error, that is, the deviation from the expected requirements

Wednesday, May 12, 2021

Question no 3839 : Material Document

In SAP MM as at ECC6.0 EhP6, which of the following data field can be changed after the Material Document is posted ?

(only one answer)

A)  Header text.
B)  Delivery Order.
C)  Bill of Lading.
D)  Goods Receipt date.
E)  Bin number.
.

Answer: A

In Standard SAP, Header text is always available for maintenance after posting.

Tuesday, May 11, 2021

Question no 3838 : Goods Issue Reference Document

In SAP MM as at ECC6.0 EhP6, which of the following are possible reference Document for Goods Issue ?

(more than one answers)

A)  Purchase Order.
B)  Reservation.
C)  Production Order.
D)  Service Order.
E)  Maintenance Order.
.

Answers: A, B, C, D, E

A) Step 1 is Goods Issue to STO.
B, C, D, E) These documents are self explanatory.

Monday, May 10, 2021

Question no 3837 : Goods Movement Posting in MIGO

In SAP MM as at ECC6.0 EhP6, which of the following Documents can be created in the MIGO Posting ?

(more than one answers)

A)  Purchase Order.
B)  Material Document.
C)  Accounting Document.
D)  Controlling Document.
E)  Service Entry Sheet.
.

Answers: A, B, C, D

A) Movement Type 161 can generate PO automatically (scenario GR without reference to PO but generates a PO).
B) All Goods Movement creates Material Document.
C, D) Generate of FICO documents depending on the Purchasing Document scenario.
E) Service Entry Sheet is created via ML81N.

Wednesday, May 5, 2021

MRP Live for Make-to-Stock Planning to Execution via FIORI and Classic App (Hana 1809)

Question no 3836 : OMJJ

In SAP MM as at ECC6.0 EhP6, Movement Type configuration provides which parameters ?

(more than one answers)

A)  Change the Help Text.
B)  Change the Short Text.
C)  Fields Selection.
D)  De-activate QM.
E)  De-activate FI postings.
.

Answers: A, B, C, D

Goto OMJJ to find out.

Tuesday, May 4, 2021

Question no 3835 : Single Maintenance Item

In SAP PM as at ECC6.0 EhP6, which of the following Maintenance Plan scenario only have one Maintenance Item allowed ?

(more than one answers)

A)  When the Call Object is Service Order for Service Contract via IP50.
B)  When the Call Object is Service Entry Sheet for Service Procurement via IP40.
C)  When the Call Object is Maintenance Order for Multiple-Counter Plan via IP43.
D)  When the Call Object is Maintenance Notification for Strategy Plan via IP42.
E)  When the Call Object is Maintenance Order for Single-Cycle Plan via IP41.
.

Answers: A, B

B, E) SES as Call Object via IP50 and IP41 will have a single Maintenance Item.
A) IP50 for Service Contract for CS have one Maintenance Item.

Monday, May 3, 2021

Question no 3834 : Call Object Service Entry Sheet

In SAP PM as at ECC6.0 EhP6, which of the following are not possible in the Maintenance Item when the Call Object is a Service Entry Sheet ?

(more than one answers)

A)  Technical Object.
B)  Planning Plant and Planner Group.
C)  Object List.
D)  Priority.
E)  Maintenance Activity Type.
.

Answers: A, B, C, D, E

When the Call Object is SES, the following is available in the Maintenance Item:
. Framework Purchase Order.
. Settlement Maintenance Order.
. General Ledger.
. Service Master.