Question no : 83 PM Execution Notification features
In SAP PM, Which of the following functions allow you to obtain a swift overview of the condition and history of the object concerned within a maintenance notification ?
A) Link list.
B) Notification display.
C) Object information.
D) Action log.
E) History list
.
A) Link list.
B) Notification display.
C) Object information.
D) Action log.
E) History list
.
Wednesday, August 6, 2008
Question no : 82 PM Execution Notification creation
In SAP PM, A maintenance notification can be created ..
I) for a functional location.
II) for an equipment.
III) for a material with a serial number.
IV) for a functinal location and equipmnt
V) without an object.
A) I, II, III
B) I, II, IV
C) I, II, III, IV
D) II, IV
E) I, II, III, IV, V
.
I) for a functional location.
II) for an equipment.
III) for a material with a serial number.
IV) for a functinal location and equipmnt
V) without an object.
A) I, II, III
B) I, II, IV
C) I, II, III, IV
D) II, IV
E) I, II, III, IV, V
.
Monday, August 4, 2008
Question no : 81 PS Logistics Scheduling Logic influences
In SAP PS, Which of the following can have an influence on the scheduling logic of networks ?
I) Relationship to other networks.
II) The control key for the activity.
III) Dates of assigned WBS elements.
IV) The work center in the activities assigned.
A) I, II, III
B) I, II, IV
C) II, III, IV
D) II, III
E) I, II, III, IV
.
I) Relationship to other networks.
II) The control key for the activity.
III) Dates of assigned WBS elements.
IV) The work center in the activities assigned.
A) I, II, III
B) I, II, IV
C) II, III, IV
D) II, III
E) I, II, III, IV
.
Saturday, August 2, 2008
Question no : 80 CO Product Costing estimate
In SAP CO, The dates proposed from costing variant during the Material Cost Estimate is used in which of the following:
A) Stamped the validity period of the Cost Estimate (costing dates from/to)
B) Basis for determination of the Quantity Structure
C) Basis for the valuation date for the Materials
D) Basis for the valuation ate fro the Activities.
E) Basis for determination of the overhead keys for the Costing Sheet.
.
A) Stamped the validity period of the Cost Estimate (costing dates from/to)
B) Basis for determination of the Quantity Structure
C) Basis for the valuation date for the Materials
D) Basis for the valuation ate fro the Activities.
E) Basis for determination of the overhead keys for the Costing Sheet.
.