In SAP PM as at ECC6 EhP6, which of the following configuration for the Maintenance Order are Plant independent ?
(more than one answers)
A) Commitment Accounting.
B) Costing Variant.
C) Settlement Profile.
D) Operational Level Costing.
E) Residence time for Deletion Flag.
.
C) Settlement Profile.
D) Operational Level Costing.
E) Residence time for Deletion Flag.
.
Answer: A, C, E
ReplyDeletecheck IMG with t-code OIOA
ReplyDelete