Question no 2743 : Perform UD pre-requisites

In SAP QM ECC6.0 EhP6, what are the pre-requisites of performing Usage Decision ?

(more than one answers)

A)  Quality Certificate has been received.
B)  No Inspection Chareacteristics have been rejected.
C)  No Defect recording were created during results recording.
D)  The Inspection Lot has a Release Status.
E)  The Material was a not flagged with Auto UD indicator.
.

3 comments:

  1. B, C) Rejected inspection characteristic or Defect Recording are not a hinderence to Usage Decision.

    ReplyDelete
  2. E) Auto UD indication for Material so not stop manual Usage Decision.

    ReplyDelete